Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 21, 2018 FBO #6146
DOCUMENT

73 -- Food Tray Delivery System Contractor/Government Questions and Answers - Attachment

Notice Date
9/19/2018
 
Notice Type
Attachment
 
NAICS
333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office 10;3140 Governor ™s Place Blvd. Suite 210;Kettering OH 45409-1337
 
ZIP Code
45409-1337
 
Solicitation Number
36C25018Q9859
 
Archive Date
10/19/2018
 
Point of Contact
Myron J Carson
 
E-Mail Address
carson@va.gov<br
 
Small Business Set-Aside
N/A
 
Description
Dayton Food Tray Delivery System Questions/Answers The following questions were submitted by potential contractors for the Dayton VA Medical Center Food Tray Delivery System Project. Answers to questions are highlighted below each question (Government). All questions were submitted by the deadline indicated in the solicitation. 1. Contractor Currently, the VA Dayton Medical Center is utilizing a divided tray. For preparation of our bid, could you please confirm the facilities preference on use of the tray for the new Retherm System as the retherm carts that will be submitted in our bid will be configured for the type of tray selected. Government Nutrition and Food Service preference is for divided tray. 2. Contractor Would the facility be interested in a retherm system that can be remote programmed and monitored from a computer located elsewhere on the campus i.e. Programming and monitoring from the Main Kitchen Office for units located in the main hospital or elsewhere on the campus? Government This option was not specified and does not fall within the SOW, and will not be considered as part of the LPTA determination. 3. Contractor What terms are required for the extended warranty listed in the bid? Government Extended Warranty would include (but is not limited to) a minimum of 1-year parts and labor coverage beyond the Standard Warranty. 4. Contractor (Contractor) is assuming that the current units are hardwired in from an electrical disconnect switch (please confirm).   If so, will it be permissible for (Contractor) to replace the disconnect switch to a j-box and drop cord?   (Contractor)  will provide the material and labor to accomplish this.   (Contractor) docking stations have a cord and plug configuration.? Government The contractor may install a junction box and needed connections after the disconnect.   The disconnect must remain in place for safety of food service and maintenance personnel. 5. Contractor (Contractor) is assuming that any patching or painting where the existing docking stations (and their electrical circuits) are removed will be the responsibility of the facility.   Please confirm. Government This should be a turnkey project, meaning that any needed drywall/paint repairs will be the responsibility of the contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/DaVAMC552/DaVAMC552/36C25018Q9859/listing.html)
 
Document(s)
Attachment
 
File Name: 36C25018Q9859 0001 36C25018Q9859 0001.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4599432&FileName=36C25018Q9859-0001000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4599432&FileName=36C25018Q9859-0001000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN05096780-W 20180921/180919231240-0c440958f0e96f1fb9a0d6c87bb0a8cd (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.