C -- AIWW Dismal Swamp Canal Upland Placement Repair and Dredging

Notice Date
8/22/2018
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Norfolk, 803 Front Street, Norfolk, Virginia, 23510-1096, United States
 
ZIP Code
23510-1096
 
Solicitation Number
W91236-18-B-0026
 
Archive Date
8/31/2018
 
Point of Contact
Jerry W. Clark-Juneau, , Danita Young,
 
E-Mail Address
Jerry.W.Clark-Juneau@usace.army.mil, danita.a.young@usace.army.mil
(Jerry.W.Clark-Juneau@usace.army.mil, danita.a.young@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
*************************** 16AUG2018: This is a repost to update this notice as a small business set-aside requirement and to delete the Definitive Responsiblity Criteria. *************************** 22AUG2018: This is a repost to update this notice for widelife service road restriction due to an endangered Red Cockaded Woodpecker. *************************** This notice is a new repost to the notice W91236-18-B-DISMAL to update the solicitation number W91236-18-B-0026. A.Solicitation Schedule: Pre-solicitation Notice: 16 August 2018 Anticipated Solicitation Notice: 31 August 2018 Anticipated Bid Opening Date: 1 October 2018 B. Project Description: The project consists of providing all labor and materials to raise the perimeter dikes of the Dismal Swamp Canal Dredged Material Disposal Area (DSCDMDA), install a 10 inch diameter High Density Polyethylene pipe (HDPE), demolish, remove and replace the existing spillbox, and dredge a portion of the Dismal Swamp Canal and the Feeder Ditch by method of hydraulic cutter head dredging. The perimeter dike raising of the DSCDMDA area will be elevated to the height indicated on the drawings. The contractor will install 500 linear feet of HDPE pipe with cover as indicated on the drawings for the purpose of discharging dredge material into the DSCDMDA. The contractor will demolish the existing spillbox, remove and dispose of debris, and construct a new spillbox in its place with a government furnished design as specified on the drawings. The work will also consist of maintenance dredging in a portion of the Dismal Swamp Canal as indicated on the drawings, and Feeder Ditch in Chesapeake, Virginia to a depth of -9 feet Mean Lower Low Water (MLLW) with an allowable over-depth of 1 foot at each location. The Dismal Swamp Canal will be dredged 1,800 feet in each direction north and south starting from where the Feeder Ditch intersect with the Canal. The Feeder Ditch will be dredged 1000 feet starting from the intersection of the Canal westward at the same -9 feet depth with 1 foot of allowable over-depth. The dredging method required for this project is hydraulic cutter head dredging and the dredge material will be transported by pipeline to the government upland disposal area adjacent to the Feeder Ditch. The total estimated amount to be dredged along with an estimated accretion is 30,000 cubic yards. The Contractor shall perform the earthwork portion of the contract during the months of December 2 through February 28. There are no dredging restrictions for this project so the contractor is expected to plan their work accordingly. C. Construction Time: For the contract bid items, begin performance within 15 calendar days for each the Earthwork and Dredging upon receipt of Notice to Proceed (NTP). The Contractor will be given 60 calendar days to complete all Earthwork and 45 calendar days to complete all Dredging work. The US Fish and Wildlife Service has issued the access road restriction through the Refuge blocks at the Dismal Swamp Canal (DSC) Upland Placement Site due to an endangered Red Cockaded Woodpecker. The Contractor will only be able to use the USFWS access road to the DSC Upland placement site from the following dates (December 2 through February 28) due to the endangered species. In order for the contractor to start earlier than the dates mentioned, the contractor will have to mobilize for earthwork to the DSC Upland placement site by barge to across the canal. There are no dredging restrictions for this project so the contractor is expected to plan their work accordingly. D. NAICS Code: 237990 applies to this procurement. E. Prospective contractors must be registered in the DOD System for Award Management (SAM) database in order to obtain access to FedBizOps. SAM Registration must also be active and current to be eligible for contract award. F. Magnitude of Job: $500,000 - $1,000,000.00
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA65/W91236-18-B-0026/listing.html)
 
Place of Performance
Address: Place of Performance: Dismal Swamp Canal, Chesapeake, Virginia, USACE Norfolk, VA 23510, United States
Zip Code: 23510
 
Record
SN05051370-W 20180824/180822231505-afab07d17ef81038d426aa09f9febeb3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.