Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 22, 2018 FBO #6116
SOURCES SOUGHT

Y -- WY TIGER US212(9) Beartooth Highway Roadway and Bridge

Notice Date
8/20/2018
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF-18-SS-0014
 
Archive Date
9/8/2018
 
Point of Contact
Sheri Muehl, Phone: 7209633351
 
E-Mail Address
sheri.muehl@dot.gov
(sheri.muehl@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DETAILS: This project is being developed in cooperation with the Shoshone National Forest (SNF), the Wyoming Department of Transportation (WYDOT), and the National Park Service (NPS). The Beartooth Highway in Wyoming begins at the Wyoming/Montana State Line east of Cooke City, Montana, following US 212 for 56.1 kilometers to the Wyoming/Montana State Line southwest of Red Lodge, Montana. The project is located entirely within the Shoshone National Forest and is maintained by the NPS out of Yellowstone National Park. In addition to being a Forest Highway, the route carries the special designation as a National Park Approach Road, a Scenic Byway, and All American Road. This project includes realignment and reconstruction of 2.61 km (1.6 miles) of roadway and a new bridge on U.S. 212, otherwise called Beartooth Highway. The project is located at an elevation of 10,950 feet with an anticipated construction season of 4-6 months per year. This project is located in an environmentally sensitive remote location with potential for unusually severe weather. TYPE OF CONSTRUCTION: roadway realignment, reconstruction, rock excavation, grading, drainage, 600 ft steel bridge, MSE walls, aggregate base course, and paving, traffic control, public information. This project consists of: Principal work items on Schedule A include: 44,000 cm (cubic meters) of roadway excavation; 800 cm structural backfill; 2,400 m2 (square meters) mechanically stabilized earth wall; 25,000t (metric tons) aggregate base; 5,000t of hot asphalt paving; 10,000 m2 pulverizing; 2,000 cm structural concrete; 291,700 kg structural steel, furnished, fabricated and erected; 475m of pipe culvert placement; 6 Ha (hectares) hydraulic seeding; 580 L (liters) of pavement markings; 9,000 flagger hours. There will be one option schedules: (1) Option X - stone masonry, plantings and scenic byway information signs. It is anticipated this project will be advertised in March 2019 with construction beginning in June 2019 and extending through October 2020. Estimated total cost for the project is $13,00,000 to $15,000,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF-18-SS-0014/listing.html)
 
Place of Performance
Address: U.S. 212 Shoshone National Forest, Park County, Wyoming, United States
 
Record
SN05045256-W 20180822/180820231044-accb37270ee56096fcb2d7089faa2b2b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.