Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 04, 2018 FBO #6098
SOLICITATION NOTICE

Y -- Replacement of Runway 5L VASI with a PAPI at W.K. Kellogg Airport, Battle Creek, Michigan

Notice Date
8/2/2018
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
FEDERAL AVIATION ADMINISTRATION, AAQ-560 CS - Central Logistics Service Area (Great Lakes)
 
ZIP Code
00000
 
Solicitation Number
697DCK-18-R-00545
 
Response Due
8/16/2018
 
Archive Date
8/16/2018
 
Point of Contact
Irene Medina, irene.medina@faa.gov, Phone: 847-294-8309
 
E-Mail Address
Click here to email Irene Medina
(irene.medina@faa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This project is for the replacement of the Visual Approach Slope Indicator (VASI) with a Precision Approach Path Indicator (PAPI) System for Runway 5L at W.K. Kellogg Airport in Battle Creek, Michigan. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract clauses, drawings, and specifications. The project work includes, but not limited to, the following: 1. Coordinate with airport operations, local FAA SSC representatives, and local utility companies to locate existing underground utilities and cabling near the construction area. 2. Using registered land surveyor, FAA contractor shall field verify the location and elevation of the PAPI - LHA s and the power and control rack (P&C). 3. Install concrete foundations for the PAPI - LHA and for the P&C rack. 4. Install an estimated 2200 feet power cable in a new 2 PVC Schd. 80, D.E.B. from the existing VASI power rack next to RWY 23 LOC shelter (see Fig.3 site photos) to the new PAPI P&C rack (see Site Plan). Also along this cable route, install handholes (Quazite) approximately every 450 and ground rod every 90 10 . 5. Install crushed rock plot for the PAPI LHA site and for the PAPI P&C rack. 6. Install a 70 long and 12 wide crushed rock access road from the existing airport crushed rock access road to the new PAPI P&C rack site and 25 x25 PAPI P&C rack plot and 20 x120 rock plot for the LHA s. 7. Install the field A-G & G-G control system (Decoder, Interface Unit, Receiver and Receiver antenna) and the FAA installation crew will install the Switch Assy Panel at the tower cab. 8. Remove completely the existing VASI LHA boxes (4 boxes) and their concrete foundations, Power and Control Rack and its concrete foundations, also remove all the power and control cables between the VASI boxes and the VASI P&C rack, also remove the power cable between the VASI P&C rack and the VASI rack and restore these sites to match the surrounding grass area. 9. Prior to removing the VASI LHA boxes, the wiring harness in the VASI boxes is believed to have asbestos containing wire insulation, thus the wiring should be wrapped securely in plastic and removed then disposed of in accordance with state and local requirements. 10. Participate in Contractor s Acceptance Inspection (CAI) with the COR, and quickly address any punch list items. CAI maybe conducted in conjunction with Joint Acceptance Inspection (JAI) with the local FAA SSC office. 11. Hand the removed VASI equipment to the SSC to excess it. The performance time is 30 calandar days. Anticipated start date of project is October 1, 2018. The estimated price range for this procurement is between $100,000 and $250,000. INTERESTED FIRMS MUST HAVE SUCESSFULLY COMPLETED SIMILAR PROJECTS BOTH IN DOLLAR AMOUNT AND SCOPE OF WORK AT AN OPERATIONAL AIRPORT. General contractors must submit their interest in subject project on company letterhead and should include the firm's name, address, telephone number, fax number, email address, and point of contact. Please submit your request to the attention of Irene Medina, to email address: irene.medina@faa.gov If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/31020 to view the original announcement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/GLR/697DCK-18-R-00545/listing.html)
 
Record
SN05017613-W 20180804/180802231216-a4a161ea877364c23c866f19694246c1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.