FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 01, 2018 FBO #6095
MODIFICATION

P -- Demolition and Removal of Structures, Pilings, Doc

Notice Date
7/30/2018
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
NPS, PWR - OLYM MABO 600 E. Park Avenue Port Angeles WA 98362-6757 US
 
ZIP Code
00000
 
Solicitation Number
140P8318Q0080
 
Response Due
8/10/2018
 
Archive Date
8/25/2018
 
Point of Contact
Fuller, Phaedra
 
Small Business Set-Aside
Total Small Business
 
Description
This is an amendment to the Request for Quotations for removing structures, pilings, and docks from 18 property sites located partly in Clallam County in the Lake Crescent subdistrict and partly in Grays Harbor County located in the Quinault subdistrict, of Olympic National Park, WA. This amendment is necessary to provide Questions/Answers, and to extend the response date. AMENDMENT 001 - QUESTIONS/ANSWERS (Q&A): 1. Q: What are the approved NPS topsoil sources? 1. A: NPS has purchased topsoil from Cascade Bark Landscape Supplies, 11 Washington Harbor Road, Sequim, WA 98382 (phone 360-582-9592), and purchased Cascade Bark's own mixture that contains Alder sawdust, red fine bark, aged cow manure, and dark fine bark. 2. Q: Can on-board electric scales on my truck be used when recycling materials rather than having to use stationary scales at a yard? 2. A: This should be acceptable. Calibration should be checked on the first load. 3. Q: Site 11 - do all of the rip rap rockery/terraces need to be removed? 3. A: The rip rap will remain in place. 4. Q: Do the well heads at some of the sites need to be capped or decommissioned? 4. A: There is a well at 8 Viewpoint Lane that has been decommissioned. NPS is not aware of any others. 5. Q: Bates House - the concrete bulkhead that spans from Thompson's to the Scott's, if removed from the Bates residence would leave a weak void to the other homeowners houses. Could it be left to avoid future problems? 5. A: The bulkhead is not part of the scope, nor is any aspect of the concrete work that would impact adjacent properties. CLARIFICATION: The response date shown in the original synopsis page as August 23rd was incorrect. The written text of the original synopsis stated the response date as August 8th, which was correct. NEW RESPONSE DATE: Response date is changed from 4:30pm (PST) on Wednesday, August 8, 2018, to 4:30pm (PST) on Friday, August 10, 2018. Submit questions to Phaedra Fuller, Contracting Officer at email address Phaedra_Fuller@nps.gov. Final questions due by 2pm (PST) on Monday, August 9, 2018.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/140P8318Q0080/listing.html)
 
Record
SN05011823-W 20180801/180730230512-3688f0fb4f319fc34beea7f0ae868583 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.