Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 28, 2018 FBO #6091
SOLICITATION NOTICE

Z -- Repair Electrical Distribution Base Wide

Notice Date
7/26/2018
 
Notice Type
Presolicitation
 
NAICS
221122 — Electric Power Distribution
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Vance Air Force Base Contracting, 246 Brown Parkway, Vance AFB, Oklahoma, 73705-5036
 
ZIP Code
73705-5036
 
Solicitation Number
IFB224B
 
Point of Contact
Teddy T. Thomas, Phone: 5802137174, Willard Vinson, Phone: 580 213-5120
 
E-Mail Address
asrcc.pm.constructionmgmt@us.af.mil, asrcc.pm.constructionmgmt@us.af.mil
(asrcc.pm.constructionmgmt@us.af.mil, asrcc.pm.constructionmgmt@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Remove the existing overhead primary 12.47 kV electrical distribution system and associated secondary lines located across the base. Install new underground primary 12.47 kV (approx. 22,000 LF) distribution system using pad mounted switchgear, sectionalizes, capacitors, and transformers and refeed secondary connection with new underground lines. Install new street light poles and fixtures to replace fixtures that will be demoed from overhead utility poles. Notice to Offeror: (s)/Supplier (s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The ASRC Federal & Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event of cancellation of this solicitation ASRC Federal & Government has no obligation to reimburse an offeror for any cost. Qualifications: The contractor whose bid was in substantial conformity to the Specifications and Plans and who have satisfactory previous experience in the types of work contained in this solicitation and have a successful track record performing the types of work contained in the project. The contract cannot be awarded until the USG has received approval of form 1391 from Higher Headquarters and Government concurrence receipt. Upon receipt of concurrence from the Government the Contracting Officer will execute the contract to the lowest responsible bidder. In the absence of funding no contract will result. Should funds be provided, to be considered for award of this project a contractor must be aware at Vance AFB also has strict Base access regulations and commercial inspections are mandatory with each entry to the facility. The acceptance period for this action will be 90 days and contractors should consider this impact to their bonding limits prior to bidding the solicitation. There shall be no legal liability on the part of the Government or ASRC should funding not be provided. Bid Evaluation: ASRC Federal must consider a bidder's experience, reputation for satisfactory work, reference checks, financial, technical competence, and Duns & Bradstreet evaluation, and Past Performances.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/CVC/IFB224B/listing.html)
 
Place of Performance
Address: VFAB, 3 miles South, Enid, Oklahoma, United States
 
Record
SN05007901-W 20180728/180726230843-0641a71186fd4cab158d927f11efb029 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.