FBO DAILY - FEDBIZOPPS ISSUE OF JULY 18, 2018 FBO #6081
AWARD

Z -- FSS Building 20170 Relocate ITT, KAFB

Notice Date
7/16/2018
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP18Q0083
 
Archive Date
7/31/2018
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP18P0055
 
Award Date
7/16/2018
 
Awardee
ALMS, LIMITED COMPANY, 11 ESPEJO AVE, MORIARTY, New Mexico 87035, United States
 
Award Amount
$57487.67
 
Line Number
0001
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for FSS Building 20170, Relocate ITT a. Demolition 1. Contractor must demo/remove existing flooring and base trim, remove screws in floor. Prep floor for electrical work and new carpet tile. 2. Contractor must demo/remove existing shelf in closet. 3. Contractor must demo/remove temporary wall at entrance gate. 4. Contractor must demo/remove existing ceiling tile and grid in its entirety, prep for new ceiling grid/tile at same height/location. 5. Contractor must demo existing lighting, prep for new lighting at same locations. 6. Contractor must remove, clean and save for reinstall all HVAC components. b. Construction 1. Contractor must provide and install new fire strobe. 2. Contractor must provide and install new light switch in closet, for operating closet light separate from main space. 3. Contractor must provide/install 1 new electrical floor box where existing electrical is penetrating floor, verify electrical in floor is operational. 4. Contractor must provide and install three (3) power/data poles. Each pole must contain two outlets, 1 data and 1 phone ports, locations TBD. Connect data lines back to COMM cabinet, reuse existing phone lines or run new to existing phone block and connect. 5. Contractor must provide and install eleven (11) new recessed duplex receptacles around the parameter of space and in closet. 6. Contractor must provide and install ten (10) new recessed RJ45 2 port data jacks, 1 port with pull string, 1 port with data. Connect data lines back to COMM cabinet. 7. Contractor to provide and install new COMM Cabinet & board. 8. Contractor must verify connectivity and operation of all outlet/phone/COMM lines label appropriately. 9. Contractor must install new Government provided COMM switch. 10. Contractor must patch/repair/texture/paint all walls, from entrance gate throughout the space. 11. Contractor must provide and install new ceiling grid and tile at same location. 12. Contractor must provide and install new LED 2 x 4 light fixtures at same locations. 13. Contractor must reinstall all HVAC components. 14. Contractor must provide and install new carpet tile. 15. Contractor must provide and install new 6" rubber base trim. 16. Contractor must rekey existing gate and COMM closet doors. Key separately.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP18P0055.html)
 
Record
SN04993630-W 20180718/180716231244-c5ba7e043a8782f015a39f12b6b0ca22 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.