SOLICITATION NOTICE

Y -- Coffee Pot #2 Bridge Construction

Notice Date
7/13/2018
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-2 White River National Forest, 900 Grand Ave., Glenwood Springs, Colorado, 81601, United States
 
ZIP Code
81601
 
Solicitation Number
1282D718R0006
 
Point of Contact
Lonnie D Root, , Erica Borum, Phone: 970-945-3277
 
E-Mail Address
lroot@fs.fed.us, eborum@fs.fed.us
(lroot@fs.fed.us, eborum@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Synopsis: The Forest Service anticipates issuing a Soliciation on or about 07/27/2018 for awarding a firm-fixed price construction contract to perform the following scope of work: The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: •Establish traffic control and detour •Remove the existing bridge •Excavate for the abutments •Construct the abutments •Construct the stream channel between abutments (step removal, grading and riprap) •Construct the timber superstructure •Construct the approaches to the structure (embankment) •Install signs •Seeding work Project Location: The Coffee Pot #2 bridge is located approximately 15 miles north of Glenwood Springs, Colorado, although the drive from there to the site is about 48 miles. The bridge is located near Deep Lake in the White River National Forest. The Contractor shall furnish the necessary personnel, materials, equipment, services and facilities. This project includes, but is not limited to, removing and disposing of the existing bridge, excavate for the abutments, construct new abutments, construct the stream channel between abutments (Step removal, grading and riprap), construct the timber superstructure, construct the approaches to the structure (embankment), install signs and seeding work to match design plans and all other incidental items necessary to complete the work according to the contract. All construction must comply with wilderness rules and restrictions. Traditional tools will be used as much as possible; however some motorized tools and mechanical transport will be allowed. Motorized tools ans mechanical transport will be restricted to the uses approved in the minimum requirements decision guide (MRDG) and minimized in the project. There will be a mandatory site visit planned TBD for construction of the bridge. This procurement is being set-aside 100% for small business. Industry Classification System Code (NAICS) is 237310 highway, street and bridge construction and the small business size standard is $36.5 million, set-aside 100% for small business. The magnitude of the contract is between $200,000.00 and $250,000.000 Contracting Office Address: White River National Forest USDA 900 Grand Ave Glenwood Springs, CO 81601 Primary Point of Contact: Erica Borum Civil Engineer, R2,White River NF,SO Phone: 970-945-3277 Email: eborum@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/3fac70af4f4e9b81887ee1826ff7d0d4)
 
Place of Performance
Address: The Coffee Pot #2 bridge is located approximately 15 miles north of Glenwood Springs, Colorado, although the drive from there to the site is about 48 miles. The bridge is located near Deep Lake in the White River National Forest., GLENWOOD SPRINGS, Colorado, 81602-0948, United States
Zip Code: 81602-0948
 
Record
SN04991309-W 20180715/180713230928-3fac70af4f4e9b81887ee1826ff7d0d4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.