MODIFICATION
19 -- Maintenance, Repair and Preservation of Edgecumbe Barge - SOW Drawings - Solicitation 1
- Notice Date
- 7/2/2018
- Notice Type
- Modification/Amendment
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- Department of the Navy, Naval Sea Systems Command, Puget Sound Naval Shipyard (PSNSY) and IMF, 1400 Farragut Ave, Puget Sound Naval Shipyard, Bremerton, Washington, 98207-5005, United States
- ZIP Code
- 98207-5005
- Solicitation Number
- N4523A18R1065
- Response Due
- 8/3/2018 2:00:00 PM
- Archive Date
- 6/30/2018
- Point of Contact
- Chris D. Campbell, Phone: 3604764333, Gary Binder, Phone: 360-476-5706
- E-Mail Address
-
chris.campbell@navy.mil, gary.binder@navy.mil
(chris.campbell@navy.mil, gary.binder@navy.mil)
- Small Business Set-Aside
- N/A
- Description
- Exhibit A, CDRLs and DIDs Combined Edgecumbe Barge Attachment J-5, Corporate Experience Data Sheet Edgecumbe Barge Attachment J-4, Contract Performance Data Sheet Edgecumbe Barge Attachment J-3, Request for Clarification Form Edgecumbe Barge Attachment J-2, Price Proposal Worksheet Edgecumbe Barge Attachment J-1, Statement of Work Edgecumbe Barge dated 1MAY2018 Solicitation for the maintenance, repair and preservation of the Edgecumbe Barge. The attached file contains the drawings found in the Statement of Work (SOW). Contact POC for password information. INFORMATION FOR POTENTIAL OFFERORS: The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bremerton Washington intends to award a standalone Firm Fixed Price contract to accomplish the maintenance, repair and preservation of the Edgecumbe Barge. Edgecumbe Barge Vessel Characteristics: Length: 240 FT Width: 60 FT Hull Type: Steel Draft: 2' 11" Light Load: 928 L Tons The Contractor's facility must possess the capability of accomodating one (1) Edgecumbe Barge with the dimensions as stated above. Coordinate with the Contracting Officer, via the Contracting Officer's Representative (COR) to deliver the vessel from Puget Sound Naval Shipyard (PSNS) Bremerton, WA to the Contractor's facility. Dock, wash, and clean the exterior surfaces of the vessel upon docking. Blast, inspect and preserve Main Deck, forward raised deck, masts, deck fittings, pad eyes, lifeline sockets and tanks and covers. Remove and replace non-skid on line handler station. Open, clean and maintain dry each tank and void. Perform preliminary air test on tanks. Accomplish full preservation of all tanks. Accomplish a final closure inspection of each tank upon completion of all work. Install new gaskets, fasteners and brass air test plug fittings. Verify all stuffing tubes are packed and tight. Perform final air tests on tanks. Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government at PSNS Bremerton with the Contracting Officer via the COR. The precise Statement of Work (SOW) for the Edgecumbe Barge is included in this solicitation package as Attachment J-1. The Contractor will arrange for and transport the vessel from PSNS & IMF to the Contractor's facility. Upon completion of all work, coordinate delivery of the vessel back to PSNS & IMF. The Period of Performance is scheduled to be: 6 November 2018 to 5 March 2018. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSEA/N62799/N4523A18R1065/listing.html)
- Place of Performance
- Address: Contractor's Facility, United States
- Record
- SN04976845-W 20180704/180702230934-4093c4ab350cc5107f870274b8898643 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |