SOLICITATION NOTICE
Y -- Designing and Constructing Channel Maintenance
- Notice Date
- 5/26/2018
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- International Boundary and Water Commission, Acquisition Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
- ZIP Code
- 79902
- Solicitation Number
- 191BWC18R0010
- Point of Contact
- Philip K. Johnson, Phone: 9158324714
- E-Mail Address
-
philip.johnson@ibwc.gov
(philip.johnson@ibwc.gov)
- Small Business Set-Aside
- N/A
- Description
- This is a Pre-solicitation Notice for the designing and constructing channel maintenance structures at an arroyo location known as Placitas Arroyo within the Rio Grande Canalization Project (RGCP) in Do ñ a Ana County, New Mexico. A forthcoming solicitation will include information on how to obtain all relevant documentation. All responsible sources may submit a proposal to be considered by the Agency when the solicitation is posted. This is NOT a request for proposal. Please do not submit a proposal in response to this Pre-solicitation Notice. This requirement is subject to availability of funds (SAF) The work requires evaluation of alternatives, design, and construction of channel maintenance structures to reduce sediment inflow to the RGCP. Major tasks for the Phase I - Design of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 1. Site investigation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 2. Site surveying <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 3. Any required geotechnical investigations, modeling, or testing. <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 4. Production of construction documents (drawings and technical specifications) <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 5. Production of all project reports <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 6. HEC-RAS 2D/FLO-2D/HEC-RAS Modeling <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 7. Coordination with stakeholders <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 8. Coordination with USIBWC Major tasks for the Phase II - Construction of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 1. Site preparation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 2. Construction of channel maintenance structures at the arroyo <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 3. Build access roads needed for routine maintenance <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 4. Disposal of sediment, debris, and construction waste from jobsite <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 5. Final site surveying The Design‑Builder shall be responsible for complying with all applicable regulations, laws, or permitting authorities pertaining to construction of this project. The magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Doña Ana County, New Mexico. A site visit date will be listed in the solicitation. The contract will be firm-fixed price. The period of performance for all work will be proposed and negotiated. A proposed duration for each phase will also be required. The proposed time for completion shall include final cleanup of the premises. The solicitation and attachments are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days. This is a Pre-solicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/191BWC18R0010/listing.html)
- Record
- SN04935525-W 20180528/180526230020-b5cdfad009a1b0175a52849fac6c9db8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |