SOLICITATION NOTICE
Z -- Repair Clinic B#2128, Suwon AB (MATOC ONLY) - SF1442
- Notice Date
- 5/22/2018
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 621112
— Offices of Physicians, Mental Health Specialists
- Contracting Office
- Department of the Army, Army Contracting Command, CSBs, 411TH CSB (W90VN6) RCO OSAN, Unit #15289, APO, Non-U.S., 96205-5289, Korea, South
- ZIP Code
- 00000
- Solicitation Number
- W90VN618R0018
- Archive Date
- 7/7/2018
- Point of Contact
- Chaeyong Yi, Phone: 3157848977
- E-Mail Address
-
chaeyong.yi5.ln@mail.mil
(chaeyong.yi5.ln@mail.mil)
- Small Business Set-Aside
- N/A
- Description
- EAL Drawings Solicitation PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features: 0001. ARCHITECTURAL WORK A. REMOVAL WORK 1. Remove existing floor finishes including carpet tile, ceramic mosaic tile (CMT), rubber tile, sheet vinyl and vinyl composition tile (VCT) as shown on the drawings. 2. Remove existing wall finishes including gypsum wall board (GWB) wall, glazed ceramic wall tile (GCWT), as shown on the drawings. 3. Remove/ install new existing doors and window w/frames including all accessories as shown on the drawings. 4. Remove existing acoustic GWB ceiling in rest room area as shown on the drawings. 5. Remove existing toilet accessories and partitions, & all appurtenances, built in granite bench and etc as shown on drawings. 6. Provide interior scaffolding if needed. 7. Dispose and haul waste material off base. 8. Existing furniture and equipment shall be removed and reinstalled by the construction contractor at government designated place. 9. Remove existing two equipment as shown on the drawings. B. INTERIOR CONTRUCTION 1. Install new GWB ceiling with steel furring including ceiling access doors at rest room as shown on the drawings. C. INTERIOR FINISH 1. Install new VCT and wax on new VCT as shown on the drawings. 2. Install new GCWT wall finish with metal lath, latex mortar and grout as shown on the drawings. 3. Install new wall base finish with rubber cove base as shown on the drawings. 4. Repaint and apply latex, oil, alkyd, epoxy paint as shown on interior finish schedule. D. MISCELLANEOUS WORK 1. Install new toilet accessories including toilet & urinal partitions, mirror glass, towel bar, shower curtains w/rods, soap dishes, toilet tissue dispensers, paper towel dispenser/waste receptacles, grab bars, soap dispensers, mop racks, shower benches and etc as shown on attached drawings. 2. Apply sealant or seal for doors and windows. 0001B. ELECTRICAL WORK A. LIGHTING SYSTEM 1. Replace existing lighting fixture with lamps at rest room area
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/2d36692e7fae80cfd12e2ab513f57f0c)
- Place of Performance
- Address: Suwon, Korea, South
- Record
- SN04929899-W 20180524/180522230624-2d36692e7fae80cfd12e2ab513f57f0c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |