Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 24, 2018 FBO #6026
SOLICITATION NOTICE

Z -- Repair Clinic B#2128, Suwon AB (MATOC ONLY) - SF1442

Notice Date
5/22/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
621112 — Offices of Physicians, Mental Health Specialists
 
Contracting Office
Department of the Army, Army Contracting Command, CSBs, 411TH CSB (W90VN6) RCO OSAN, Unit #15289, APO, Non-U.S., 96205-5289, Korea, South
 
ZIP Code
00000
 
Solicitation Number
W90VN618R0018
 
Archive Date
7/7/2018
 
Point of Contact
Chaeyong Yi, Phone: 3157848977
 
E-Mail Address
chaeyong.yi5.ln@mail.mil
(chaeyong.yi5.ln@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
EAL Drawings Solicitation PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features: 0001. ARCHITECTURAL WORK A. REMOVAL WORK 1. Remove existing floor finishes including carpet tile, ceramic mosaic tile (CMT), rubber tile, sheet vinyl and vinyl composition tile (VCT) as shown on the drawings. 2. Remove existing wall finishes including gypsum wall board (GWB) wall, glazed ceramic wall tile (GCWT), as shown on the drawings. 3. Remove/ install new existing doors and window w/frames including all accessories as shown on the drawings. 4. Remove existing acoustic GWB ceiling in rest room area as shown on the drawings. 5. Remove existing toilet accessories and partitions, & all appurtenances, built in granite bench and etc as shown on drawings. 6. Provide interior scaffolding if needed. 7. Dispose and haul waste material off base. 8. Existing furniture and equipment shall be removed and reinstalled by the construction contractor at government designated place. 9. Remove existing two equipment as shown on the drawings. B. INTERIOR CONTRUCTION 1. Install new GWB ceiling with steel furring including ceiling access doors at rest room as shown on the drawings. C. INTERIOR FINISH 1. Install new VCT and wax on new VCT as shown on the drawings. 2. Install new GCWT wall finish with metal lath, latex mortar and grout as shown on the drawings. 3. Install new wall base finish with rubber cove base as shown on the drawings. 4. Repaint and apply latex, oil, alkyd, epoxy paint as shown on interior finish schedule. D. MISCELLANEOUS WORK 1. Install new toilet accessories including toilet & urinal partitions, mirror glass, towel bar, shower curtains w/rods, soap dishes, toilet tissue dispensers, paper towel dispenser/waste receptacles, grab bars, soap dispensers, mop racks, shower benches and etc as shown on attached drawings. 2. Apply sealant or seal for doors and windows. 0001B. ELECTRICAL WORK A. LIGHTING SYSTEM 1. Replace existing lighting fixture with lamps at rest room area
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/2d36692e7fae80cfd12e2ab513f57f0c)
 
Place of Performance
Address: Suwon, Korea, South
 
Record
SN04929899-W 20180524/180522230624-2d36692e7fae80cfd12e2ab513f57f0c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.