Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 12, 2018 FBO #6014
AWARD

Z -- BlDG 323 Repair 2nd Floor Office & Bathroom

Notice Date
5/10/2018
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP18Q0058
 
Archive Date
5/24/2018
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP18P0036
 
Award Date
5/9/2018
 
Awardee
Desert Sand Builders, Inc, 52 BERTA DR, Edgewooed, New Mexico 87015, United States
 
Award Amount
$149,754.13
 
Line Number
0001
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 323 Repair 2nd Floor Offices and Restrooms. a.Demolition 1.Existing carpet and wall base to be removed as indicated on drawings. 2.Existing electrical to be removed as indicated on drawings. 3.Existing flooring to be removed as indicated on drawings. 4.Existing upper and lower cabinets to be removed as indicated on drawings. 5.Existing plumbing fixtures, wall partitions and dispensers to be removed as indicated on drawings. 6.Existing sound soak to be removed as indicated on drawings. 7.Existing door and wall between break room and conference room to be removed as indicated on drawings. 8.Existing light fixtures to be removed as indicated on drawings. 9.Existing ceiling grid and tiles to be removed as indicated on drawings. b.Construction 1.Contractor shall provide and install new carpet tile as indicated on drawings. 2.Contractor shall provide and install new rubber wall base as indicated on drawings. 3.Contractor shall provide and install new transition strip as indicated on drawings. 4.Contractor shall provide and install new flooring as indicated on drawings. 5.Contractor shall provide and install new toilet partitions as indicated on drawings. 6.Contractor shall provide and install new grab bars as indicated on drawings. 7.Contractor shall install government provided toilet paper dispenser as indicated on drawings. 8.Contractor shall provide and install new water closet as indicated on drawings. 9.Contractor shall provide and install new lockable lever handle as indicated on drawings. 10.Contractor shall provide and install new trap guard for floor drain as indicated on drawings. 11.Contractor shall provide and install new urinal as indicated on drawings. 12.Contractor shall provide and install new water fountain as indicated on drawings. 13.Contractor shall provide and install new plumbing and drain lines as indicated on drawings. 14.Contractor shall provide and install new metal stud wall as indicated on drawings. 15.Contractor shall provide and install refrigerator as indicated on drawings. 16.Contractor shall paint as indicated on drawings. 17.Contractor shall provide and install plastic laminate upper and lower cabinets with shelving as indicated on drawings. 18.Contractor shall provide and install integral solid surface backsplash as indicated on drawings. 19.Contractor shall provide and install new integral bowl sink as indicated on drawings. 20.Contractor shall provide and install new faucet as indicated on drawings. 21.Contractor shall provide and install electrical receptacles as indicated on drawings. 22.Contractor shall provide and install new ceiling grid and tiles as indicated on drawings. 23.Contractor shall provide and install new GFCI duplex receptacles as indicated on drawings. 24.Contractor shall provide and install new duplex receptacles as indicated on drawings. 25.Contractor shall provide and install new microwave as indicated on drawings.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP18P0036.html)
 
Record
SN04918474-W 20180512/180510230747-75fa9d600f9053c89493a6ae3be11fb8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.