Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 17, 2018 FBO #5958
MODIFICATION

Y -- UT FLAP 2496(1), Ephraim Canyon Road - Solicitation 1

Notice Date
3/15/2018
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF18B000005
 
Response Due
4/17/2018 2:00:00 PM
 
Point of Contact
Ryan Phillips, , Sheri Muehl,
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Blue Top Report Pavement Report Plans Solicitation PROJECT NUMBER: UT FLAP 2496(1) PROJECT NAME: Ephraim Canyon Road PROJECT DESCRIPTION: The proposed project consists of the rehabilitation and paving of Ephraim Canyon Road (SR 29) from MP 1.7 to MP 6.5. Ephraim Canyon Road is a major collector southeast of the town of Ephraim in Sanpete County, Utah. The County owns and maintains the mountainous roadway which is partially located in the Manti-La Sal National Forest (USFS). Schedule A spans the first 3.8 miles from the end of the pavement on Ephraim Canyon Road to the Willow Creek Road intersection, and Option X spans the last 1.1 miles from Willow Creek Road to the road to Lake Hill Campground. The existing, 28-foot-wide, gravel road was engineered and widened in 2007. The prosed typical section includes a 26 foot wide paved width with shouldering and graded ditches. Roadway improvements include shaping and grading the existing bench, new asphalt concrete, drainage and safety improvements. Additional work includes the installation of select new culverts, embankment repair, underdrain installation, minor cut slopes, parking lot construction, paving pullouts, signing and striping, guardrail replacement, seeding, and grading ditches. SIGNIFICANT QUANTITIES (Schedule A and Option X): 5 miles of roadway reconditioning 12,000 ton of Aggregate Base 23,000 ton Asphalt Pavement Survey (LPSM) Temporary traffic control (LPSM) ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS: $3 to $6 million This project is will be solicited on a full and open basis on or around March 15, 2018.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF18B000005/listing.html)
 
Place of Performance
Address: Sanpete County, Utah, United States
 
Record
SN04856241-W 20180317/180315232047-479ccdae46095ebd6de491c85c8ef9b0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.