FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 04, 2018 FBO #5945
SOURCES SOUGHT

Z -- Dale Hollow Power Plant Cable Trays

Notice Date
3/2/2018
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Nashville, Attn: CELRN-CT, PO Box 1070, Nashville, Tennessee, 37202-1070, United States
 
ZIP Code
37202-1070
 
Solicitation Number
W912P518S0005
 
Archive Date
3/27/2018
 
Point of Contact
Kristal R Jones, Phone: 615-736-7916
 
E-Mail Address
Kristal.R.Jones@usace.army.mil
(Kristal.R.Jones@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The Government is issuing this Sources Sought Notice to determine a competitive basis. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this notice. Requirement The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates soliciting a requirement for a firm fixed price construction contract to remove existing asbestos cable trays and install new metal cable trays in the powerhouse as well as under the roadway at Dale Hollow Dam. The estimated magnitude of this project is between $250,000 and $500,000. The types of work and skill sets for this requirement are as follows: a) Demolition; debris and rubbish removal (asbestos and metal); b) Procurement and installation of new metal cable trays in accordance with NEMA VE1, American Welding Society, ASTM International, the National Association of Architectural Metal Manufacturers and any other relevant standards; c) Placing existing cables into new metal cable trays; d) Conduct survey (with licensed surveyor) to establish types of materials and amounts of materials required by the drawings and specifications; e) Adhere to safety standards when handling hazardous materials and electrical cables; e) Validate drawings and specifications, including measurements and materials; f) Communicate with USACE personnel, notify USACE personnel of all revisions made to drawings, and provide final hard-copy drawings and soft-copy drawings (DGN or DWG format extensions) to USACE. The anticipated NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $36.5 million in annual receipts. Survey Your response to this survey is requested by Monday, March 12, 2018 at 4:00 p.m. Central Daylight Savings Time (CDT). All information MUST be submitted by e-mail to Contract Specialist Kristal Jones at Kristal.R.Jones@usace.army.mil or by fax to 615-736-7124. 1. Name of your firm: 2. CAGE: 3. Point of Contact, Phone number and EMAIL address: 4. Please list three (3) projects that show removal of asbestos cable trays and the install of new metal cable trays successfully completed, similar to the above referenced type of work. If possible, provide projects that cover the most skill sets listed above preferably at power generation facilities. Examples must be from projects in which your firm was the prime, or sub-contractor, and in which your firm performed at least 50% of the construction work. Examples must have been completed within the last eight (8) years. a. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: b. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: c. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of project: 5. Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6. If your company is a small business concern, per FAR 52.219-14, at least 25 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. Can your firm be expected to do this, given your current employee situation? (Please respond yes or no.) 7. If this requirement is advertised, do you anticipate submitting an offer? 8. Please provide any additional information you feel is necessary.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P518S0005/listing.html)
 
Place of Performance
Address: Dale Hollow Power Plant, United States
 
Record
SN04841137-W 20180304/180302231318-ce46a40ec29cabc00974b148733be61e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.