Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 04, 2018 FBO #5945
MODIFICATION

Y -- WATER MONITORING WELL INSTALLATION IN PIGEON CANYO

Notice Date
3/2/2018
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
USGS OAG SACRAMENTO ACQUISITION BR. MODOC HALL, CSUS 3020 STATE UNIVERSITY DRIVE EAST SACRAMENTO CA 95819-6027 US
 
ZIP Code
00000
 
Solicitation Number
140G0318Q0034
 
Response Due
3/30/2018
 
Archive Date
4/30/2018
 
Point of Contact
Shannon, Donald
 
Small Business Set-Aside
Total Small Business
 
Description
REQUEST FOR QUOTATIONS - PLEASE READ ALL INSTRUCTIONS AND DOCUMENTS ATTACHED. Project Description: The Arizona Water Science Center in Tucson, AZ is in need of a contractor experienced with the installation of groundwater monitoring wells in consolidated deposits in Northern Arizona. A single perched groundwater monitoring well is needed as part of a groundwater water-quality study which will monitor possible contributions from the former Pigeon uranium mine to elevated uranium concentrations at Pigeon Spring. The monitoring well will 1) monitor water levels in the well to obtain local information on the direction of perched groundwater flow; and, 2) monitor water quality in the well to compare with water chemistry at Pigeon Spring. The depth of the well is expected to be about 550 feet. Magnitude of Construction: The estimated magnitude of construction project is between $25,000 and $100,000. Location of Work: The monitoring well shall be drilled at location 36 °43.87548' North latitude and 112 °29.20338' West longitude (NAD83 datum; fig. 2). This location is approximately 7 miles down unpaved roads after turning off Forest Service Road 22 at White Sage Flat. (This turnoff is approximately 15-20 miles southeast of Fredonia, AZ) Tentative date for contract award is approximately 30 days after the closing date of the solicitation. The contract's period of performance is flexible, but must be completed no later than 9/30/2018. NOTES: a. This requirement is 100% set aside for small businesses under NAICS 237110. b. See page 1 of 9 of the attached terms and conditions for information regarding an organized site visit to the worksite for this project. c. This project is subject to availability of funds prior to award. In the event that sufficient funding for this project cannot be committed to the project upon reaching the point of award, we will be unable to make award. In that event, the solicitation will be cancelled; and no award will be made. d. REQUEST FOR QUOTATIONS - PLEASE READ ALL INSTRUCTIONS AND DOCUMENTS ATTACHED. QUOTES THAT DO NOT CONFORM TO THE INSTRUCTIONS OR PROVIDE SUFFICIENT INFORMATION FOR EVALUATION WILL NOT BE CONSIDERED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/USGS/USGS/140G0318Q0034/listing.html)
 
Record
SN04840783-W 20180304/180302231022-9bcb914c6e65781ee13ee0a7fab013dd (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.