Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 01, 2018 FBO #5942
MODIFICATION

Y -- Brush Creek Hayden Sewer/Water Line Project - 100% Plans

Notice Date
2/27/2018
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-2 Rocky Mountain Region, Regional Office, 1617 Cole Blvd, Lakewood, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
12850818R0003
 
Archive Date
5/2/2018
 
Point of Contact
Star M. Yeo, Phone: 3032755311, Jacob Brown, Phone: 307-745-2436
 
E-Mail Address
starmyeo@fs.fed.us, jacobwbrown@fs.fed.us
(starmyeo@fs.fed.us, jacobwbrown@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Statement of Work Schedule of Items OPC Upsized System Project Manual Revised Plans **PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW** This is a new project for construction services for the Brush Creek/Hayden Ranger District located on the Medicine Bow-Routt National Forest and Thunder Basin National Grassland (MBRTB). The purpose of this contract is to perform sewer and water line construction work at the Brush Creek/Hayden Ranger District compound located in Saratoga, Wyoming. The work shall consist of all necessary labor, supervision, equipment, tools, and materials to connect the District compound to the Town of Saratoga's municipal utilities. The sanitary sewer construction will require the installation of a duplex grinder pump lift station, and the construction of approximately 160 lineal feet of 1 ¼" sanitary sewer force main, 210 lineal feet of 4" gravity sanitary sewer, and 980 lineal feet of 6" gravity sanitary sewer from the existing Town of Saratoga 8" gravity sanitary sewer. The existing onsite wastewater disposal system will be abandoned in accordance with WYDEQ regulations once the new sanitary sewer is connected to the Town of Saratoga. In addition, the project includes construction of approximately 630 lineal feet of 12" water main, 710 lineal feet of 8" water main, 760 lineal feet of 4" fire service line, and 760 lineal feet of 1-1/2" domestic services to three buildings onsite, three fire hydrants, and all taps, valves, meters, fittings, thrust blocks, and other appurtenances to connect the Forest Service site to the Town of Saratoga's water distribution system. All work shall adhere to industry standards, local building code requirements, and manufacturer installation recommendations. General specifications for all End Result type work listed in the Schedule of Items are included in this original solicitation as attachment Project Manual Construction Documentation version 06/12/2017 and Municipal Water & Sewer Construction Plan. The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. Location of Project: 2171 Highway 130 PO Box 249 Saratoga, WY 82331 Latitude 41.437808° Longitude -106.803759° Contract Time: 180 calendars days, starting on or about June 1, 2018 Contract magnitude of this contract is between $250,000 to $500,000. Pre Bid Conference is not mandatory for prime contractor or contract representative but is recommended as there will be site walk through. Conference is currently scheduled for 21 March 2018 @ 10:00 am Mountain Time at the following location: Brush Creek Hayden Ranger District 2171 S Wyoming 130 Saratoga, WY 82331 Please RSVP with Jacob Brown at jacobwbrown@fs.fed.us Bonds: A Bid guarantee is NOT required with the offer. Offers must be able to bond for estimated amount of $500,000. Offeror shall submit proof of bonding capabilities (signed and stamped letter from bonding agent). Letter shall state contractor's bonding levels. Contractors unable to bond for $500,000 amount will be eliminated from competition. If awarded, the performance and payment bonds are to be 100% of the award amount. Refer to FAR 28.102-2. This guidance is in accordance with FAR 52.228-1. North American Industrial Classification (NAICS) Code applicable to this acquisition is 237110, Water and Sewer Line and Related Structure Construction. Small Business Size Standard for this acquisition is $36.50 million THIS IS A TOTAL SMALL BUSINESS SET ASIDE SOLICITATION DOCUMENTATION WILL BE POSTED ON OR ABOUT March 26, 2018.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/82X9/12850818R0003/listing.html)
 
Place of Performance
Address: 2171 Highway 130, Saratoga, Wyoming, 82331, United States
Zip Code: 82331
 
Record
SN04836924-W 20180301/180227231905-f5035f968d249e8b8392a6d813e1b9d7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.