AWARD
Y -- Falcon-3 Facilities and Infrastructure, State of Qatar
- Notice Date
- 2/13/2018
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE Middle East District, Attn: CETAC-PD-CT, 201 Prince Frederick Drive, Winchester, Virginia, 22602-5000, United States
- ZIP Code
- 22602-5000
- Solicitation Number
- W912ER-17-R-0022
- Archive Date
- 2/27/2018
- Point of Contact
- Tino Philip,
- E-Mail Address
-
Tino.Philip@usace.army.mil
(Tino.Philip@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W91218C0010
- Award Date
- 2/12/2018
- Awardee
- United Construction Establishment (“UCE”), United Construction Establishment (“UCE”)<br />, Attn: Mr. Ghassan Kawash<br />, Haloul Street, Al Mamoora, Fish Market<br />, Doha, Non-U.S. 99999, Qatar
- Award Amount
- $11,451,676.58
- Line Number
- [Base [SubCLIN’s 0001AA through 0004AH], Option 1 [SubCLIN 0005AA through 0005AC], Option 2 [SubCLIN 0006AA] and Option 3 [SubCLIN 0007AA].
- Description
- The U.S. Army Corps of Engineers (USACE), Middle East District (TAM), has a requirement from State of Qatar, funded through Foreign Military Sales (FMS) Letter of Offer and Acceptance (LOA) QA-B-HAA. This LOA is in support of the Government of Qatar's Apache Helicopter procurement case; LOA QA-B-WYX. LOA QA-B-WYX primarily includes, the aircraft, munitions, and logistical and training support. The Apache helicopter is part of an overall effort to improve the security of a friendly nation that has been, and continues to be, an important force for political and economic progress in the Middle East. These required facilities and infrastructure will support the bed-down and operations of the Apache helicopter mission and allow for integration with U.S. forces for training exercises, which contributes to regional security and interoperability. The scope of the project will be constructed in accordance with the Solicitation is: (1) Renovate Existing Parking-Maintenance Helicopter Hangar and Apron. The Period of Performance (PoP) for this work shall be 150 calendar days from Notice to Proceed (NTP); and (2) Qatari Armed Forces (QAF) West Munitions Storage Area. The PoP for this work shall be 300 calendar days from NTP. The project has four options: Option #1 Renovation Existing Apron, Option #2 Design of Hangar Renovations, Option #3 Mobile 400 Hz Frequency converters and Option #4 Fire Protection Engineer Report in accordance with the contract documents. The name of the project has been revised to Falcon-3 Facilities and Infrastructures, Qatar.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/Awards/W91218C0010.html)
- Record
- SN04821496-W 20180215/180213231535-16d67d5f0736a2dadf04be31b0842dea (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |