MODIFICATION
Y -- Facilities Maintaince - Amendment 2
- Notice Date
- 1/30/2018
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District St. Louis, 1222 Spruce Street, Room 4.207, St. Louis, Missouri, 63103-2833, United States
- ZIP Code
- 63103-2833
- Solicitation Number
- W912P918B0006
- Archive Date
- 3/1/2018
- Point of Contact
- Virginia E. Bjornson, Phone: 314-331-8054, Archie C Ringgenberg, Phone: 314 331-8505
- E-Mail Address
-
virginia.e.bjornson@usace.army.mil, Archie.C.Ringgenberg@usace.army.mil
(virginia.e.bjornson@usace.army.mil, Archie.C.Ringgenberg@usace.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment 0002 Questions & Answers as of 30 January 2018. 1. What is prevailing wage rate for Plumbers the rate is not included in Wage Determination with the Solicitation ? - An additional Wage Determination, to include residential type trades has been incorporated through amendment 0002 2. Is a separate Addendum going to be issued other the Addendum concerning Bid Bond Amounts and subsequent Performance and Payment Bond Amounts? - A subsequent amendment has been issued, 0002. Please review and acknowledge all amendments in writing with your bid submission. 3. What Gage are the Culverts to be? - 12 4. Do you have Model Number, Manufacture or Specification for Electrical Pedestals? - Specs read: RV style for outdoor use with 50, 30 and 20 amp breakers and outlets equal to or better than Milbank (manufacturer). 5. Are the questions ask at the pre-bid meeting going to be addressed in an addendum ? - It is not clear what questions remain to be answered. 6. Regarding Utility locations inside campgrounds. It was stated at the pre-bid meeting that the Contractor is responsible to locate all the Corps Utilities. What about utilities that can not be located with a locator as there are some utilities that are older and do not have marking tape or wires and/or the tapes and wires were placed at a depth greater than the locator can pick up. How will repairs of these utilities be handled ? - In this scenario, the Government has/does not hold the Contractor liable. History suggests the Government and Contractor work together and make necessary repairs. 7. Regarding installation of underground utilities are services will the Corp provide lines and grades and locations ? - The Government field locates proposed layout and can provide copies of as-built drawings that show current lines and grades of utilities. This was stated at the pre-bid meeting. 8. 0012f slab jacking - Could you be a little more specific on what would we be raising, is it in parking lot,or walk next to a building? - This line item could be used to raise and/or fill voids under sidewalks, ditches, driveways, etc. It will not be used on the main concrete portion of the dam. As was stated at the pre-bid meeting. 9. item x010z Pressure sewer force main installation just making sure it's the pipe and installation only, and the pump cost not included. - Correct, pump not included. All materials, labor, pipe, fittings, glue, misc.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/50a271bffb586dda331614c914899cd7)
- Place of Performance
- Address: Lake Shelbyville Project Office, U.S. Army Corps of Engineers - St. Louis District, 1989 State Highway, Shelbyville,, Illinois, 62565-4631, United States
- Zip Code: 62565-4631
- Zip Code: 62565-4631
- Record
- SN04803923-W 20180201/180130231012-50a271bffb586dda331614c914899cd7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)