Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 01, 2018 FBO #5914
MODIFICATION

Y -- Facilities Maintaince - Amendment 2

Notice Date
1/30/2018
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District St. Louis, 1222 Spruce Street, Room 4.207, St. Louis, Missouri, 63103-2833, United States
 
ZIP Code
63103-2833
 
Solicitation Number
W912P918B0006
 
Archive Date
3/1/2018
 
Point of Contact
Virginia E. Bjornson, Phone: 314-331-8054, Archie C Ringgenberg, Phone: 314 331-8505
 
E-Mail Address
virginia.e.bjornson@usace.army.mil, Archie.C.Ringgenberg@usace.army.mil
(virginia.e.bjornson@usace.army.mil, Archie.C.Ringgenberg@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 0002 Questions & Answers as of 30 January 2018. 1. What is prevailing wage rate for Plumbers the rate is not included in Wage Determination with the Solicitation ? - An additional Wage Determination, to include residential type trades has been incorporated through amendment 0002 2. Is a separate Addendum going to be issued other the Addendum concerning Bid Bond Amounts and subsequent Performance and Payment Bond Amounts? - A subsequent amendment has been issued, 0002. Please review and acknowledge all amendments in writing with your bid submission. 3. What Gage are the Culverts to be? - 12 4. Do you have Model Number, Manufacture or Specification for Electrical Pedestals? - Specs read: RV style for outdoor use with 50, 30 and 20 amp breakers and outlets equal to or better than Milbank (manufacturer). 5. Are the questions ask at the pre-bid meeting going to be addressed in an addendum ? - It is not clear what questions remain to be answered. 6. Regarding Utility locations inside campgrounds. It was stated at the pre-bid meeting that the Contractor is responsible to locate all the Corps Utilities. What about utilities that can not be located with a locator as there are some utilities that are older and do not have marking tape or wires and/or the tapes and wires were placed at a depth greater than the locator can pick up. How will repairs of these utilities be handled ? - In this scenario, the Government has/does not hold the Contractor liable. History suggests the Government and Contractor work together and make necessary repairs. 7. Regarding installation of underground utilities are services will the Corp provide lines and grades and locations ? - The Government field locates proposed layout and can provide copies of as-built drawings that show current lines and grades of utilities. This was stated at the pre-bid meeting. 8. 0012f slab jacking - Could you be a little more specific on what would we be raising, is it in parking lot,or walk next to a building? - This line item could be used to raise and/or fill voids under sidewalks, ditches, driveways, etc. It will not be used on the main concrete portion of the dam. As was stated at the pre-bid meeting. 9. item x010z Pressure sewer force main installation just making sure it's the pipe and installation only, and the pump cost not included. - Correct, pump not included. All materials, labor, pipe, fittings, glue, misc.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/50a271bffb586dda331614c914899cd7)
 
Place of Performance
Address: Lake Shelbyville Project Office, U.S. Army Corps of Engineers - St. Louis District, 1989 State Highway, Shelbyville,, Illinois, 62565-4631, United States
Zip Code: 62565-4631
 
Record
SN04803923-W 20180201/180130231012-50a271bffb586dda331614c914899cd7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.