Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 25, 2018 FBO #5907
SOURCES SOUGHT

36 -- Oxygen and Nitrogen Cylinder Filling Systems

Notice Date
1/23/2018
 
Notice Type
Sources Sought
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
Department of the Air Force, Pacific Air Forces, 18 CONS - Kadena, Unit 5199, Kadena AB, APO Japan, 96368-5199
 
ZIP Code
96368-5199
 
Solicitation Number
F2H3C88009AW01
 
Archive Date
3/14/2018
 
Point of Contact
Angelo Cabuang, Phone: 07015740317, Jose A. Hernandez, Phone: 3156344789
 
E-Mail Address
angelomykael.cabuang.1@us.af.mil, Jose.Hernandez.17@us.af.mil
(angelomykael.cabuang.1@us.af.mil, Jose.Hernandez.17@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a Request for Information (RFI) only. This is NOT a Request for Quote / Proposal. As part of market research, 18th Contracting Squadron is seeking qualified contractors that will be able to provide an Oxygen and Nitrogen Cylinder Filling Systems (High Pressure Cylinder Filling Pumps, Vaporizers, Manifolds, and control systems). The purpose of this requirement is to modernize/replace the current system in place. See salient characteristics and additional requirements below for further information: 1. Four (4) sections of both systems (Oxygen and Nitrogen) -- a. ACD High Pressure Pump - Liquid Oxygen or Liquid Nitrogen is transferred by a hose to the pump. b. Vaporizer - Some of the Liquid Oxygen or Liquid Nitrogen returns back to the issuing tank, while the remainder goes through a vaporizer, where the Liquid is turned in to a gaseous state. c. Oxygen Manifold and Nitrogen Manifold - Once the gaseous Oxygen or Gaseous Nitrogen leaves the vaporizer, the high pressure gas goes through stainless steel Liquid Oxygen clean lines to the Oxygen or Nitrogen Manifold. Each manifold will have 20 connection points on each of the 2 sides, where the cylinders will be connected. The Nitrogen manifold must have one side with (20) CGA680 connections for filling 3,500 PSI N2 cylinders and the other side must have (20) CGA540 connections. The Oxygen manifold must have (20) CGA540 connections on each side. Once the cylinders are connected, they will be vented, evacuated to eliminate any impurities, and filled (Oxygen) and vented and filled for Nitrogen. There is a currently installed vacuum pump station for the Oxygen manifold that will be connected to the new system. d. PLC - Both Oxygen and Nitrogen manifolds will have a control panel for starting and stopping of the pump as well as to control the cylinder filling via pressure and temperature. Must have emergency stops for each pump/system. 2. Both systems have to connect to the O2/N2 purity analyzer on the oxygen and nitrogen generating plant currently in place. 3. Both systems shall be warranted for at least a year. 4. The contractor shall professionally train the requiring office on how to operate both systems. 5. The contractor shall also provide all spare parts, manuals, installation and commissioning. 6. Installation shall consist of unloading and setting equipment, connecting pre-fabricated wiring and flexible piping between tanks and vaporizers, connecting electric power. All engineering work, labor, and material to fabricate the equipment described herein in accordance with specifications shall be furnished. 7. The contractor shall perform a final inspection of the modular components prior to shipment. This inspection shall include pressure and strength & tightening tests on applicable modules; operation and validation of the control system; functional checkout of valves, electrical components and instrumentation; calibration of instrumentation. 8. The contractor shall ensure FCA incoterms 2010 delivery to Tracy, CA consolidation point. Contractor who are interested should respond electronically to SSgt Angelo Cabuang via email at angelomykael.cabuang.1@us.af.mil by 04:30 p.m. JST on 07 Feb 2018. Include the following information: Company name and address Physical location of company Point of contact with name, title, phone and email CAGE code and DUNS number Capability Statement Product Specifications Any comments, concerns, etc. Acquisition Type: Firm-Fixed Purchase Order NAICS: 332420 Metal Tank (Heavy Gauge) Manufacturing Location of services: Kadena Air Base, Okinawa, Japan Note: This notice is for informational purposes only. Any response to this notice is not considered a commitment by the Government. The Government will not reimburse contractors for any cost incurred for their participation in this Request for Information.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/PAF/18CONS/F2H3C88009AW01/listing.html)
 
Place of Performance
Address: Kadena Air Base, Okinawa, Japan
 
Record
SN04797687-W 20180125/180123231800-3b2607b5371f97b07a33079b191aaac5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.