Y -- BROADVIEW GENERATOR UPGRADES – ICE (U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT) BROADVIEW FACILITY, BROADVIEW, COOK COUNTY, IL
- Notice Date
- 1/19/2018
- Notice Type
- Modification/Amendment
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Chicago, 231 South LaSalle Street, Suite 1500, Chicago, Illinois, 60604, United States
- ZIP Code
- 60604
- Solicitation Number
- W912P618B0004
- Point of Contact
- Anita R. Simpkins, Phone: 3128465370, Regina G. Blair, Phone: 312-846-5371
- E-Mail Address
-
anita.r.simpkins@usace.army.mil, regina.g.blair@usace.army.mil
(anita.r.simpkins@usace.army.mil, regina.g.blair@usace.army.mil)
- Small Business Set-Aside
- Woman Owned Small Business
- Description
- This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested/potential contractors of the District's imminent issue of an Invitation for Bid Package for its construction project entitled, "BROADVIEW GENERATOR UPGRADES - ICE (U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT) BROADVIEW FACILITY, BROADVIEW, COOK COUNTY, IL " PROJECT INFORMATION: Under the contract, the contractor will be required to provide the following construction services. • This is a requirement to overhaul of the existing generator and provide new ATS along with generator circuit breaker, cable, conduit and other electrical equipment; to replace the existing BAS with a new BAS; to identify corrective actions in the equipment control and/or operation; and implement corrective actions to optimize HVAC equipment controls. • Generator Scope: - Furnish and install one (1) 500amp breaker, in NEMA-1 enclosure, on existing generator. - Furnish and install 500amp feed from existing generator to new breaker, on existing generator. - Furnish and install temporary 500amp feed from new breaker on existing generator, to existing Generator Distribution Panel (GDP). - Remove existing generator controller/distribution panel. - Remove existing concrete pad for existing generator controller/distribution panel. - Saw cut floor from outside wall, straight back, approximately 12 feet and remove concrete for new pipes to be installed. Core two (2) holes in foundation, next to the door, for conduits outside. - Furnish and install 800amp feed, from existing junction box outside on wall, to new ATS location, next to existing generator (normal power). - Furnish and install one (1) reinforced concrete pad for Automatic Transfer Switch (ATS). - Furnish and install reinforced concrete for floor patch. - Furnish and install one (1) ASCO Series 300, 800amp, 3-pole, 4-wire, 120/208v ATS service entrance rated, in NEMA-1 enclosure, located on new concrete pad, next to existing generator. - Furnish and install one (1) service rated separately derived ground from new ATS to cold water pipe and bond to ATS neutral. Remove existing separately derived ground from existing 800amp Main Distribution Panel (MDP) - Remove existing 500amp temporary feed from new breaker on existing generator, to existing GDP. - Furnish and install one (1) 500amp, 3-phase, 4-wire, 120/208v feed, with ground, from existing generator to ATS (emergency power). - Furnish and install one (1) 800amp, 3-phase, 4-wire, 120/208v feed, with ground, from ATS to existing MDP (load). - Furnish and install low voltage time delays on air conditioning units. - Remove existing Kohler 400amp ATS and install new 400amp ASCO ATS. two (2) holes in foundation, next to the door, for conduits outside. - Furnish and install 800amp feed, from existing junction box outside on wall, to new ATS location, next to existing generator (normal power). - Furnish and install one (1) reinforced concrete pad for Automatic Transfer Switch (ATS). - Furnish and install reinforced concrete for floor patch. - Furnish and install one (1) ASCO Series 300, 800amp, 3-pole, 4-wire, 120/208v ATS service entrance rated, in NEMA-1 enclosure, located on new concrete pad, next to existing generator. - Furnish and install one (1) service rated separately derived ground from new ATS to cold water pipe and bond to ATS neutral. Remove existing separately derived ground from existing 800amp Main Distribution Panel (MDP) - Remove existing 500amp temporary feed from new breaker on existing generator, to existing GDP. - Furnish and install one (1) 500amp, 3-phase, 4-wire, 120/208v feed, with ground, from existing generator to ATS (emergency power). - Furnish and install one (1) 800amp, 3-phase, 4-wire, 120/208v feed, with ground, from ATS to existing MDP (load). - Furnish and install low voltage time delays on air conditioning units. - Remove existing Kohler 400amp ATS and install new 400amp ASCO ATS. - Furnish and install tap box with 500amp feed to GDP (Generator Distribution Panel). Tap box to be located on right hand side of outside door. - Furnish and install one (1) surge suppressor on MDP. • The Broadview Generator Upgrades is a new requirement. Projects at the USACE, Chicago District of this acquisition type has not been performed. The work of this project is specialized for natural gas generators with HVAC systems. • Currently issues are experienced with the boiler heat that is directly tied to the outdated Distech controller. Prompt attention is needed to the issues the existing system is having. Contracting Office: USACE Chicago District, 231 South LaSalle Street, Suite 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is 100% set aside for Woman Owned Small Business concerns. The North American Industry System Classification Code is 238220, with a small business size standard in dollars of $15.0M. The magnitude of cost for construction is estimated between $100,000 and $250,000. The Solicitation package (Invitation for Bids - "IFB") will be downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website ("Federal Business Opportunities"), interested bidders may download the full package, includes: specification and drawings files. The Solicitation package is planned for advertisement on or about January 26, 2017, with bids due 30 calendar days following the issuance/release date of the Solicitation package. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. In order for contractors to be awarded contracts with the Department of Defense, the contractor must be registered in the System for Award Management (SAM); Contractors can access the SAM database & register for free at http://www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ms. Anita Simpkins at (312) 846-5370, or via email: anita.r.simpkins@usace.army.mil. ** Please include Solicitation Number W912P618B0004 on all correspondence. ** SPECIAL NOTICE: THE GOVERNMENT IS UNDER NO OBLIGATION TO RECEIVE BIDS FOR THIS PROJECT UNTIL IT HAS SECURED ALL THE NECESSARY REAL ESTATE and 401 PERMIT; THUS, THE BID DUE DATE IS SUBJECT TO BEING EXTENDED UNTIL SAID ITEMS HAVE BEEN ACQUIRED. WHEN ACQUIRED, CONTRACTORS WILL BE ADVISED BY WAY OF AN AMENDMENT.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA23/W912P618B0004/listing.html)
- Place of Performance
- Address: Broadview, IL, Broadview, Illinois, United States
- Record
- SN04794349-W 20180121/180119230808-81e68c89aefdf2381971a227fdb2d2f5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |