SOURCES SOUGHT
Y -- NE FLAP 7136(1), Montrose Bridge
- Notice Date
- 1/10/2018
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- 6982AF-18-SS-0001
- Archive Date
- 2/8/2018
- Point of Contact
- Craig Holsopple, Phone: 720-963-3350
- E-Mail Address
-
craig.holsopple@dot.gov
(craig.holsopple@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on January 24, 2018: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) Letter from bonding agent stating your firm's capability to bond for a single project of $1 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the NE FLAP 7136(1), Montrose Bridge project in which you performed ( as the prime contractor ) removal of bridge, removal of bridge superstructure, embankment construction, steel H-Pile, structural concrete, reinforcing steel, and pre-fabricated steel bridge. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: NE FLAP 7136(1), Montrose Bridge Montrose Bridge is located in Sioux County, Nebraska approximately 25 miles northeast of Harrison. The bridge is on Montrose Road and crosses over Hat Creek. Montrose Road is owned and maintained by Sioux County. The road provides access to Oglala National Grasslands. This project consists of replacing the existing bridge with a new prefabricated steel bridge with structural steel decking and aggregate wearing surface. The existing abutment piles and wingwalls will be reused, to the maximum extent possible, with additional piles being added to provide adequate support. Bridge transition railing will be added, which the original bridge did not have. The existing roadway approaches will be widened to match the new bridge width and the existing roadway width. Additionally, the widening will allow the installation of the transition railing and end terminals. The road will be closed during construction and the project is expected to take 4 months. Items worth noting: Sioux County will be performing work as part of the match, so coordination between the County and the Contractor will be critical. •· Bridge submittals and manufacturing will be a long duration item, therefore they may need to be addressed before NTP is given. Principal Work Items 20304-2000 Removal of Bridge (Partial Substructure) •· 20304-4000 Removal of Bridge Superstructure •· 20420-0000 Embankment Construction •· 55104-1000 Steel H-Pile, 14x89, In Place •· 55201-0200 Structural Concrete, Class A(AE) •· 55401-2000 Reinforcing Steel, Epoxy Coated •· 55504-0000 Pre-Fabricated Steel Bridge (104'x20', 1-Lane) It is anticipated that the project will be advertised in May, 2018 with a Notice to Proceed issued in July, 2018. The anticipated range for the project is $500k to $1 million. THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF-18-SS-0001/listing.html)
- Place of Performance
- Address: Sioux County, Nebraska, 69346, United States
- Zip Code: 69346
- Zip Code: 69346
- Record
- SN04786547-W 20180112/180110231321-f3e0823778cf949d497fbfcb6a879532 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |