Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 16, 2017 FBO #5867
SOLICITATION NOTICE

Y -- CA FLAP SR89(2), Meeks Bay Trail

Notice Date
12/14/2017
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00002
 
Point of Contact
Ryan Phillips, , Jeremiah Rogers,
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
HUBZone
 
Description
PROJECT NUMBER: CA FLAP SR 89(2) PROJECT NAME: Meeks Bay Trail and Tahoe City Sidewalk and Bike Trail Project PROJECT DESCRIPTION: The Meeks Bay Trail (Schedule A) is located on the west shore of Lake Tahoe approximately 10 miles south of Tahoe City and 18 miles northwest of South Lake Tahoe in eastern El Dorado County, California. The project includes construction of a 0.7-mile long Class 1 Bike Path on a new alignment. The bike path will start at the Meeks Bay Resort & Marina and end at the existing path near Sugar Pine Point State Park. Project improvements include a bike/pedestrian Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) over a drainage channel, bicycle railings, rockeries, and water quality features to treat runoff from the SR 89 ROW. The project includes four crossings of private driveways and one crossing of a culvert. The Tahoe City Sidewalk and Bike Trail Project (Option X) is located in Tahoe City, California near the SR 89 and SR 28 intersection area. The project includes 0.4 miles of bike path construction, broken into three separate locations. The project also includes 0.25 miles of sidewalk construction at three separate locations. The project also includes the addition of lighting infrastructure along West Lake Boulevard. The project will tie into the existing Truckee River Bridge project. SIGNIFICANT QUANTITIES: Schedule A: (0.71 miles of 10' paved bike path, GRS-IBS Bridge, and rockeries) - Significant items include (quantities are subject to change): •Removal of 55 trees •2,500 CY of Roadway Excavation •450 CY of Rockeries •1,000 Tons of Hot Asphalt Concrete Pavement •1,500 CY of Roadway Aggregate •1 - Prefabricated weathering steel pedestrian bridge, 65' long •1,700 feet of pedestrian railing Option X: - Significant items include (quantities are subject to change): •0.25 miles of Lighting Improvements •700 Tons of Asphalt Concrete Pavement •800 SY of Concrete Sidewalk The expected release of the solicitation is early January, 2018. The price range of this project work is between $1 and $5 million. This will be set-aside for HUBZone Small Business Concerns.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00002/listing.html)
 
Place of Performance
Address: Lake Tahoe Basin National Forest, El Dorado County, California, United States
 
Record
SN04767100-W 20171216/171214231109-618e5ca567f55a7b7c714a38c4f163a3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.