Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 07, 2017 FBO #5858
MODIFICATION

C -- A-E FYIR 31(3) RAILROAD BRIDGE Buy Indian Small Business Set-Aside.

Notice Date
12/5/2017
 
Notice Type
Modification/Amendment
 
NAICS
541310 — Architectural Services
 
Contracting Office
BIA WRO 00011 2600 N CENTRAL AVENUE Contracting Office SUITE 400 MAILROOM Phoenix AZ 85004 US
 
ZIP Code
00000
 
Solicitation Number
140A1118Q0008
 
Response Due
12/22/2017
 
Archive Date
2/22/2018
 
Point of Contact
Robinson, Paul
 
Small Business Set-Aside
Indian Small Business Economic Enterprises
 
Description
Amendment No. 1 is issued to 140A1118Q0008 to provide response to questions:. Question 1: Is this a replace in kind size, or will there be improvements to width of roadway, providing curb and gutter, sidewalks, etc.? RESPONSE: For the purposes of bidding consider this to be a replace in-kind, however, the Government reserves the right to make adjustments during the design of the project. Question 2: Does the roadwork include alignment changes to the substandard (60-foot radius) curve on Quechan Road? RESPONSE: This will be determined during design when the impacts of a change in existing conditions can be properly assessed. QUESTION 3: Will the retaining wall on the easterly side of the road be rebuilt as part of this work? RESPONSE: It is not anticipated at this time that the retaining wall need to be rebuilt. QUESTION 4: Will we be redoing the signalized intersection? It is difficult to tell if this signal is tied to the signal for the one-lane bridge, but that appears likely. RESPONSE: It is not anticipated at this time that the signalized intersection will be re-done. QUESTION 5: Will we be impacting and relocating utilities (overhead power poles line the roadway)? RESPONSE: Until surveys have been completed and impacts of design assessed, the Government cannot provide a more detailed response. QUESTION 6: Have any drainage concerns been identified? RESPONSE: No Question 7: Are there any as-built drawings for the current bridge structure? RESPONSE: There are no as-built drawings available. Question 8: Can they be provided? RESPONSE: No Question 9: Have there been any studies or structural investigations done on the bridge in the most recent years to identify the condition/quality of the existing substructure which is to be re-used? RESPONSE: No
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/140A1118Q0008/listing.html)
 
Record
SN04757473-W 20171207/171205231520-cb33b121a1bd79acd0be3baa67c8aea5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.