Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 06, 2017 FBO #5857
SOLICITATION NOTICE

Y -- NV/AZ FTBR US93(2), Hoover Dam Access Road

Notice Date
12/4/2017
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF18B000007
 
Point of Contact
Jeremiah Rogers, , Ryan Phillips,
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
NV/AZ FTBR OLD US93(2), Hoover Dam Access Road The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the Bureau of Reclamation (BOR) is proposing to rehabilitate the Hoover Dam Access Road and associated parking lots through the NV/AZ FTBR OLD US93(2), Hoover Dam Access Road project. The Hoover Dam Access Road project is located at the Hoover Dam, approximately 33.5 miles east of Las Vegas, NV. The project does cross the dam, with work in both Nevada and Arizona. The project focuses on a pavement preservation approach to the existing roadway and parking lots, consisting of primarily surface treatments, ranging from a crack sealing and pavement patching to micro-surfacing, thin bonded overlays and pavement milling and asphalt overlays. SIGNIFICANT QUANTITIES (Schedule B): Schedule A: •· 40301-0100, Asphalt Concrete Pavement, Type 1, 1,600 TON •· 41801-2000, Asphalt Concrete Pavement Patch, Type 2, 2,100 SQYD •· 42901-0000, Ultra-Thin Bonded Wearing Course, 2,500 TON •· 63402-0300, Pavement Markings, Type B, Solid and Broken, 35.5 MILE Option X: •· 40901-2000, Micro Surfacing, Type 2, 38,850 SQYD •· 63402-0300, Pavement Markings, Type B, Solid, 13.0 MILE Option Y: •· 30402-5300, Full Depth Reclamation, Method 2, 6-Inch Depth, 6,500 SQYD •· 40301-0100, Asphalt Concrete Pavement, Type 1, 1,000 TON MISCELLANEOUS: The contractor will be required: •· To provide the Bureau of Reclamation a minimum of 3 days notice for all equipment and fuel being delivered to the project site. No equipment will be allowed to mobilize to the site and no fuel deliveries will be allowed without advance notification. •· Pay differing Davis-Bacon wage rates for Arizona and Nevada. The contractor will need to track the work in each state to insure the proper Davis-Bacon wages are paid where the work is performed. •· Provide a historical monitor for all construction operations within 3' of the historical rock wall located at Hoover Dam project site for Schedule A and Option X. •· Perform all asphalt milling, asphalt patch repairs, and asphalt concrete pavement placement during the night for Schedule A. •· Maintain traffic and traffic control to keep the traveling public safe during all construction operations. It is anticipated that the project will be advertised in December, 2017 with a Notice to Proceed issued in February, 2018.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF18B000007/listing.html)
 
Place of Performance
Address: Hoover Dam, Boulder City, Nevada, 89005, United States
Zip Code: 89005
 
Record
SN04756074-W 20171206/171204231108-782cae1ce4e8b763d16d4b40a07f9c89 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.