SOLICITATION NOTICE
M -- Interior painting and tile of ceilings - SOW
- Notice Date
- 9/25/2017
- Notice Type
- Cancellation
- NAICS
- 325510
— Paint and Coating Manufacturing
- Contracting Office
- NASA Shared Services Center (NSSC), Building 1111, Jerry Hlass Road, Stennis Space Center, Mississippi, 39529, United States
- ZIP Code
- 39529
- Solicitation Number
- 80NSSC17Q0513
- Archive Date
- 10/13/2017
- Point of Contact
- JONIQUE R. FARVE, Phone: 2288136653, Brad Binder, Phone: 2288136110
- E-Mail Address
-
jonique.r.farve@nasa.gov, brad.j.binder@nasa.gov
(jonique.r.farve@nasa.gov, brad.j.binder@nasa.gov)
- Small Business Set-Aside
- N/A
- Description
- RFQ for paint of interior walls and replacing the ceiling tiles. State of work STATEMENT OF WORK 1. Objective/Requirements The Columbia Room is an area frequented by visitors for Lessons Learned tours and the tour area needs to be updated to present a professional and effective appearance. The objective is to update the finishes to in the public space. 2. Characteristics, Scope, and Specs The contractor shall perform the following duties: • All areas of work to be included are described in the attached sketch. • Paint interior wall surfaces in the vestibule and main area with latex paint. Colors are TBD. Protect red demarcation line and labels on walls. All paints are to be latex, and meet MPI Extreme Green Paint Standard. • Replace the main room doors with commercial grade wood double doors and infill the remaining opening space with glazed infill panels. Door swing direction to match existing swing. Door opening is approximately 8' wide by 8'6" tall. • Protection of floors and artifacts from dust and paint will be required. No spray painting will be allowed. • The work in the room shall be split into 2 areas to allow for removal of room furniture and displays out of the work area. • Access to the facility will require a TAA badge for all employees that come on site, and access to the room will need to be coordinated with the room user at all times due to the sensitive nature of the room contents. • Provide submittals for government approval for doors, frames, infill panels, paint colors, product data sheets, and ceiling tiles prior to ordering of any material. • OPTION 1, provide price to paint the ceiling tiles and grid flat black. 3. Place of Performance Columbia Storage Room, VAB K6-0848, Kennedy Space Center. 4. Period of Performance Work shall be performed October 1, 2017 through December 31, 2017.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/b2af56014d30d1d50d3d3fd2036d7448)
- Record
- SN04692512-W 20170927/170925231313-b2af56014d30d1d50d3d3fd2036d7448 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |