SOLICITATION NOTICE
Y -- CO FTNP COLM 10(3), Rim Rock Drive
- Notice Date
- 9/7/2017
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6817B00018
- Point of Contact
- Sheri Muehl, Phone: 7209633351
- E-Mail Address
-
sheri.muehl@dot.gov
(sheri.muehl@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATION ARE NOT AVAILABLE. PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument. Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information. This project consists of: Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving. Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours Option X: Phased Construction of.5 miles of roadway reconstruction and paving. Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement;.05 miles of pavement markings; 200 flagger hours. Option Y: Phased Construction of.4 miles of roadway reconstruction and paving. Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement;.04 miles of pavement markings; 200 flagger hours. It is anticipated this project will be advertised in October, 2017 with construction beginning in December 2017 and extending through September 2018. Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00018/listing.html)
- Place of Performance
- Address: Colorado National Monument, Mesa County, Fruita, Colorado, 81521, United States
- Zip Code: 81521
- Zip Code: 81521
- Record
- SN04665417-W 20170909/170907231646-af1275ab73779b8bd6e0a006b179332f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |