MODIFICATION
20 -- Dockside Repairs to Coast Guard Cutter Sycamore
- Notice Date
- 8/18/2017
- Notice Type
- Modification/Amendment
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- Department of Homeland Security, United States Coast Guard (USCG), USCG Surface Forces Logistics Center (SFLC) Procurement Branch 2, 1301 Clay St., Suite 807N, Oakland, California, 94612-5249, United States
- ZIP Code
- 94612-5249
- Solicitation Number
- DOCKSIDE-REPAIRS-CGC-SYCAMORE
- Archive Date
- 10/31/2017
- Point of Contact
- Andrew G. Jacobs, Phone: 5106375874, Rosalie Ignacio, Phone: (510) 637-5975
- E-Mail Address
-
Andrew.G.Jacobs@uscg.mil, Rosalie.H.Ignacio@uscg.mil
(Andrew.G.Jacobs@uscg.mil, Rosalie.H.Ignacio@uscg.mil)
- Small Business Set-Aside
- N/A
- Description
- Since the website temporarily isn't allowing the specification to post, below is the list of work items. WORK ITEM 1: Tanks (Potable Water), Clean and Inspect...................................................................... 11 WORK ITEM 2: Hydraulically Operated Cargo Hatch, Inspect and Service............................................. 15 WORK ITEM 3: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean................................... 19 WORK ITEM 4: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean.................. 23 WORK ITEM 5: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning................................. 27 WORK ITEM 6: Vent Ducts (All Other), Commercial Cleaning............................................................... 30 WORK ITEM 7: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test........................... 33 WORK ITEM 8: Hydraulic Chain Stoppers, Inspect And Service............................................................. 38 WORK ITEM 9: Crossdeck Winches, Inspect and Service........................................................................ 43 WORK ITEM 10: Hydraulic Inhaul Winch, Inspect And Service.............................................................. 51 WORK ITEM 11: Mechanical Chain Stoppers, Inspect and Service.......................................................... 62 WORK ITEM 12: Anchor Windlass, Inspect and Service.......................................................................... 65 WORK ITEM 13: Warping Capstan, Inspect and Service.......................................................................... 69 WORK ITEM 14: Single Point Davit, Inspect and Service........................................................................ 72 WORK ITEM 15: Commissary Hoist, Inspect and Service........................................................................ 74 WORK ITEM 16: Buoy Crane, Appleton EB4806040, Inspect And Service............................................. 78 WORK ITEM 17: Sewage Piping, Clean And Flush.................................................................................. 89 WORK ITEM 18: Tanks (Grey Water Holding), Preserve "100%"........................................................... 93 WORK ITEM 19: Tanks (Grey Water Holding), Preserve "Partial".......................................................... 96 WORK ITEM 20: Tanks (Potable Water), Preserve "100%"..................................................................... 99 WORK ITEM 21: Tanks (Sewage Holding), Preserve "100%"................................................................ 103 WORK ITEM 22: Tanks (Sewage Holding), Preserve "Partial".............................................................. 106 WORK ITEM 23: Tanks (Potable Water), Preserve "Partial".................................................................. 109 WORK ITEM 24: Decks - Exterior (Buoy or Construction Deck), Preserve 100%................................ 113 WORK ITEM 25: Mast Multi-Cable Transit Block, Install...................................................................... 117 WORK ITEM 26: Mechanical Chain Stoppers, Relocate......................................................................... 119 WORK ITEM 27: SSDG Isolation Mount, Renew................................................................................... 121 WORK ITEM 28: SSDG Heat Exchanger, Modify.................................................................................. 145 WORK ITEM 29: Superstructure, Preserve "Partial"............................................................................... 149 WORK ITEM 30: Exhaust Stacks (Exterior), Preserve - Partial............................................................... 154 WORK ITEM 31: Non-Machinery Spaces, Preserve and Insulate (Various Compartments)................... 159 WORK ITEM 32: Deck Covering (Interior Wet/Dry), Renew (Various Compartments)........................ 162 WORK ITEM 33: CPO Stateroom (01-57-2-L) Bulkhead, Inspect and Repair........................................ 165 WORK ITEM 34: Buoy Deck Bulwark, Preserve.................................................................................... 168 WORK ITEM 35: Buoy Cargo Hold Deck and Bulkheads, Preserve 100%............................................. 170 WORK ITEM 36: Buoy Crane Pedestal Interior (3-23-0-Q), Preserve.................................................... 172 WORK ITEM 37: Fuel Oil Transfer Gage Piping, Renew....................................................................... 174 WORK ITEM 38: Rails, Stanchions and Lifeline Inspect, 100% Preserve.............................................. 183 WORK ITEM 39: Handrails and Stanchions, Renew............................................................................... 186 WORK ITEM 40: Fo'c'sle Fittings and Components, Preserve............................................................... 188 WORK ITEM 41: SORS Cargo Hold Deck and Bulkheads, Preserve 100%........................................... 190 WORK ITEM 42: Seawater Cooling System Piping, Renew................................................................... 192 USCGC WORK ITEM 43: Reach-In Reefer and Freezer Box, Renew.................................................................. 199 WORK ITEM 44: Fuel Oil Purifier (FOP) Overhaul................................................................................ 201 WORK ITEM 45: Buoy Deck Auxiliary Cleat & Snubbing Winch Installation...................................... 205 WORK ITEM 46: SORS Cargo Hatch, Inspect and Repair...................................................................... 210 WORK ITEM 47: Grey Water Holding Tank(s), Clean and Inspect........................................................ 215 WORK ITEM 48: Sewage Holding Tank(s), Clean and Inspect............................................................... 219 WORK ITEM 49: Temporary Services, Provide - Cutter......................................................................... 223 WORK ITEM 50: Temporary Messing, Provide...................................................................................... 226 WORK ITEM 51: Temporary Berthing, Provide...................................................................................... 229 WORK ITEM 52: Main Diesel Engines, Mount Renewal........................................................................ 232 WORK ITEM 53: Fire Pump #2 Discharge Root Valve Piping, Repair................................................... 245 WORK ITEM 54: Cargo Hold Padeyes Renew........................................................................................ 251 WORK ITEM 55: Deck Plating 04 Level, Repair..................................................................................... 255
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/VPLMLCP/DOCKSIDE-REPAIRS-CGC-SYCAMORE /listing.html)
- Place of Performance
- Address: To be determined, the contractor's facility, United States
- Record
- SN04635771-W 20170820/170818231410-f64ea19100488465b483e9d8b3611e1f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |