Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 19, 2017 FBO #5748
DOCUMENT

Y -- 674-17-2-5860-0006-Waco Campus Wide PA- - Attachment

Notice Date
8/17/2017
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office (NCO17);Central Texas Veterans HCS;2002 Scott Boulevard;Temple TX 76504
 
ZIP Code
76504
 
Solicitation Number
VA25717B1216
 
Response Due
9/13/2017
 
Archive Date
12/21/2017
 
Point of Contact
Rachelle Moore
 
E-Mail Address
9-6028<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Information Only-Pre-Solicitation Notice: The Central Texas Veterans Health Care System (CTVHCS), Network Contracting Office, NCO17 anticipates awarding a Firm-Fixed-Price construction contract to install a new Public Announcement Mass Notification System, Project Number: 674A4-17-0083, located at the Veterans Affairs Medical Center, 4800 Memorial Drive, Waco, Texas 76711. The method of procurement shall be an Invitation for Bid (IFB) in accordance with the procedures set forth in Parts 14 and 36 of the Federal Acquisition Regulation. This requirement is a competitive offer, Set Aside 100% for Service Disabled Veteran Owned Small Business (SDVOSB). The applicable NAICS code is 238210, $15 Mil. The magnitude of the construction estimate range: $100,000.00 to $250,000.00. All work shall consist of, but not limited to: The Contractor shall provide all labor, material, equipment and supervision to perform the following project work: Provide and Install a new Campus Wide PA / Mass notification communications network system installed in the following Buildings #2, #4, #7, #10, #11, #91 and #94 that has the capability to be divided into sub-zones and subsections of the sub-zones. The PA system needs to easily expand and be reconfigurable. Ability to schedule and provide installation in such a manner that will not impede patient care. Computer-Aided design (CAD) or Building Information Modeling (BIM) drawings of the completed installation, that shows where all cables and devices are installed. Provide training for programming the system, troubleshooting the system, and repairing the system (inclusive of documentation, i.e. handbooks). Minimum one year warranty with a 4-hour response time. Contractor shall use the existing Fiber Optic Network Cable, which is already installed on the campus between the buildings. Contractor shall follow the National Fire Protection Act (NFPA) guidelines (as applicable). The entire project is to be completed within 180 days from issuance of the Notice to Proceed (NTP).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VACTHCS674/VACTHCS674/VA25717B1216/listing.html)
 
Document(s)
Attachment
 
File Name: VA257-17-B-1216 VA257-17-B-1216_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3740359&FileName=VA257-17-B-1216-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3740359&FileName=VA257-17-B-1216-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN04634230-W 20170819/170817232050-a7da596aa5f2e2f48462e9dab24d4012 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.