Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 26, 2017 FBO #5724
SOLICITATION NOTICE

Y -- HJ Andrews EF Electric Heat Pump Replacement - AG-82FT-S-17-0021

Notice Date
7/24/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Agriculture, Forest Service, Rocky Mountain Research Station, 240 West Prospect Road, Fort Collins, Colorado, 80526, United States
 
ZIP Code
80526
 
Solicitation Number
AG-82FT-S-17-0021
 
Archive Date
8/29/2017
 
Point of Contact
Anthony O Salas,
 
E-Mail Address
asalas@fs.fed.us
(asalas@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
AG-82FT-S-17-0021 A. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning unit for the Lanudry/Batrhoom system to the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. Install one new 240 Volt Single Phase, 2 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 19.1 Seer 240 Volt Single Phase,2 Ton Heat Pump and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductor wire to the new 35 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system. 2. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 1: B. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning that operates the Dining/Kitchen system in the McRae Cafeteria building. The Contractor shall remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. In the Dining/Kitchen System install one new 240 Volt Single Phase, 5 Ton Electric Forced Air Handler (cap off the existing Propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18 Seer 240 Volt Single Phase, 5 Ton Heat Pump (Carrier 25VNA060A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductors to the new 90 Amp Air Handler Panel per Oregon Statel Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system. 3. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 2: C. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning that serves the Foyer in the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. Install one new 240 Volt Single Phase,4 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18.3 Seer 240 Volt Single Phase, 4 Ton Heat Pump (Carrier 25NAA048A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductor wire to the new 80 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system. The allotted time for this contract is 30 days from the notice to proceed. Pre-proposal Site Visit - Upon Request. Location: HJ ANDREWS EXPERIMENTAL FOREST USFS ROAD 15-130-132 BLUE RIVER, OREGON 97413 The magnitude of this project is less than $25,000. This acquisition is 100% set-aside for Small Business concerns under NAICS Code 238220. Offerors shall submit all questions in writing by August 7, 2017. Questions shall be sent to asalas@fs.fed.us. Submit your proposal electronically to asalas@fs.fed.us, no later than August 14, 2017 11:00am MT.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/82FT/AG-82FT-S-17-0021/listing.html)
 
Place of Performance
Address: HJ Andrews Experimental Forest, Blue River, Oregon, 97413, United States
Zip Code: 97413
 
Record
SN04593065-W 20170726/170725085606-2e1040d5e71b01babe3b4665ee2d57c8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.