DOCUMENT
C -- VA247-17-AP-8146 Address Potential Legionella Issue Ph 2 - Attachment
- Notice Date
- 7/10/2017
- Notice Type
- Attachment
- NAICS
- 541310
— Architectural Services
- Contracting Office
- Department of Veterans Affairs;Ralph H. Johnson VA Medical Center;109 Bee Street;Charleston SC 29403-5799
- ZIP Code
- 29403-5799
- Solicitation Number
- VA24717R0740
- Response Due
- 7/31/2017
- Archive Date
- 9/29/2017
- Point of Contact
- CASSAUNDRA MULLIGAN AND
- Small Business Set-Aside
- N/A
- Description
- 16 SCOPE OF WORK Address Potential Legionella Issues Phase II 534-18-104 I. SUMMARY OF SERVICES REQUIRED: Provide the Design Services listed below. They are summarized here to provide an overview; detailed requirements follow in this document. Design Elements of Specific Concern for this project is provided at the end of this document in paragraph XII.4. The summary of A/E services required includes, but, is not limited to: Site visits, all necessary field investigations The preparation of design and design documentation including Schematic Design, Preliminary Design, Design Development, and final Construction Documents, including construction drawings, specifications, cost estimates, analysis and narratives as summarized here and described at the end of this attachment, expanded upon in PG 18-15, A/E Submission Requirements, and other guidelines that make up this contract. Construction documents will become part of the construction contract and shall be sufficient to support competitive bidding. Bidding and Negotiation support, as required, to explain and clarify the A/E s work during the Bidding and Negotiation process. Actual Bidding and Negotiation will be accomplished by the Department of Veterans Affairs. The reproduction of review documents and construction documents are to be included as part of this contract. Construction Period Services Support as required to verify compliance with the designer s intent, both during the submittal process and during actual construction, and to document variances from the original construction documents. The Department of Veterans Affairs will administer the actual construction. Post Construction Services will be required to 1) update the original construction documents to reflect changes and unforeseen conditions encountered during construction (Record Drawings) and 2) to incorporate the updated construction documents into the facilities master drawing documentation (As-Builts). II. SCOPE OF CONSTRUCTION shall be established as follows: FINISHES shall be consistent with other finishes in the area of work or coordinated with new guidelines now being established. Verify with Staff Engineer upon start of finishes work. Insure all work is coordinated with the Finishes and Furnishings coordinator. BUILDING ACCESSORIES such as toilet accessories will not generally be required as the Medical Center provides and installs them in coordination with the product suppliers. Those accessories required for safety as well as the operation and maintenance of building systems shall be required. Coordinate with the COTR upon start of Design Development. Consideration and selection of specific furnishings and portable equipment will typically not be a part of this work. INDUSTRIAL HYGIENE issues services shall be coordinated with the COTR. ELECTRICAL DESIGN - The VA does not generally permit Hot Work. Power interruptions require substantial advance coordination and shall be acknowledged in the project s design. SIGNAL, COMMUNICATION, AND CONTROL SYSTEMS. Modifications will be required to any existing alarm, signal, and communications systems disrupted by any work. Additionally, work shall be evaluated to determine any Energy Monitoring and Control System linkages that might be required. EQUIPMENT issues will be considered. COST ESTIMATING: Detailed line item cost estimates showing materials and labor with appropriate markups for each shall be provided beginning with Design Development Submissions. The contractor s contingency, overhead, and profit shall be listed as separate items and not prorated in the line items but listed as a separate item. Subcontractor s markups may be handled as convenient upon coordination with the Staff Engineer. Estimates shall be provided at all submissions; those preceding design development may incorporate a lesser degree of detail. DESIGN WITHIN AVAILABLE FUNDS: As mentioned elsewhere, the A/E is required to design within the funds available. This requirement is further modified to require design within 90% of the funds available leaving 10% of the funds as a margin of safety. The A/E shall confirm the budget prior to its start of design. BID ITEMS shall be utilized to assist in awarding within the funding limitations as well as to assist in maximizing the use of all the funds available. SUBMITTAL LIST. Provide a list of submittals required during the construction process. The list shall include as a minimum; a name (Electrical Devices), type (samples, literature, shop drawings, etc.), and specification section reference, as well as any other information that may be deemed appropriate. III. THE FACILITY at which the work will be performed is the Ralph H. Johnson VA Medical Center located at 109 Bee St., Charleston, SC 29401. IV. GUIDE SPECIFICATIONS: The A/E shall use the VA Master Specifications available from www.cfm.va.gov/til/. The VA will provide guidance to the Web site. V. PLOTTING REQUIREMENTS: All Construction Document Drawings will be plotted onto 30 x 42 inch sheets with border lines @ 28x40 inches. Refer to the locally available VAMC Charleston AutoCAD Guidelines, www.cfm.va.gov/TIL/sDetail.asp, and related documents for additional information and guidance. See elsewhere in this document for additional drawing format requirements. VI. DRAWING DISTRIBUTION: Once the 100% design has been reviewed and approved, and the cover sheet signed, the A/E shall deliver the original Construction Document Drawings, Specifications, Computer Disks (Construction Document Drawings & Specifications), Cost Estimates, Narratives, and reproduced documents to the Chief, Engineering Service as one package. The cost of the drawing material, computer disks, reproduction of the design review submittals, specifications, reports, and cost estimates will be included in this contract. VII. CAD TEMPLATES: The A/E will utilize the Charleston VAMC provided AutoCAD Cover Sheet drawing (VA-COVER.DWG), Title Block drawing (VABORDER.DWG), Finish Schedule drawing (FINISH.DWG) and the Signage Schedule drawing (SIGNSCH.DWG) for the project drawings. The Cover Sheet includes an area for the signature of the Medical Center Director/Assistance/Associate, Chief of Staff, Engineering Service, Energy Manager, IH/Safety/Infection Control, and Service Chiefs involved; an index of the drawings; and key drawing. General notes and other pertinent items will be provided by the A/E on the cover sheet. The drawings indicated above will be provided by the VA as a part of the project CD disk. VIII. DRAWING FORMATS: The A/E will utilize copies of the current version of AutoCAD As-Built plans as listed in the Engineering Service AutoCAD Guideline Index. The A/E may utilize copies of the VA Record Drawings as may be available and relevant to this work. IX. CAD REQUIREMENTS: Computer-Aided Design (AutoCAD) Management Requirements: The A/E will follow the Charleston VAMC Engineering Service AutoCAD Guidelines in the development of the Project Construction Drawing Documents, Record Drawing Documents and As-Built modifications. In particular, the following sections apply: Section B: Engineering Service AutoCAD Project Requirements for Architects/Engineers. Section C: Group No. 1 Plotting Configurations Section E: Plot Configuration Parameters (PCP). Guidelines are available electronically from this Medical Center. X. DESIGN CRITERIA: The A/E will use the criteria in the Office of Construction & Facilities Management Technical Information Library as the basis for the design and its development for this project. This library may be found at www.cfm.va.gov/TIL/. The VA criteria listed below are available at this library unless originating in the Public domain or indicated to be locally available. These criteria are common to most work but shall not be considered as all-inclusive and shall be applied as appropriate to the specific project design. Variances and Requirements for additional technical or design guidance shall be addressed to the Contracting Officer s Technical Representative. Listing of Design Criteria for Project Design Program: VA Master Construction Specifications VA Construction Standards VA Architectural Standards VA Mechanical Standards VA Electrical Standards Electrical Design Criteria VA Equipment Guide List Hardware (Equipment) Symbols Seismic Requirements VA Planning Criteria Barrier Free Design Handbook Uniform Federal Accessibility/Standards/ADA / UFAS VA Signage Standards (format available) VA Interior Finish Standards VAMC Interior Design Standards VA HVAC/Plumbing Design Criteria VA Industrial Hygienist Requirements JCAHO Criteria Uniform Building Code/International Code NFPA Life Safety Codes Energy Code (Lighting & HVAC) ASHRAE/IES Standard 90.1 (DOE Federal Energy Standard 10 CFR Part 435) Engineering Service AutoCAD Requirements Space Planning Criteria VA Fire Protection Design Manual Infection Control Risk Assessment Compliance with all known applicable codes, including VA criteria, standards & guidelines, will be reflected in the completed design documents. Conflicting criteria shall be brought to the attention of the Chief of Engineering Service for resolution. Typically the most stringent criteria will apply. Codes used by the VA are listed at www.cfm.va.gov/TIL/cpro/cpTop01.doc. The primary focus is typically the Life Safety Code; the Uniform Building Code is still noted as the VA model building code. XI. AVAILABLE INFORMATION: Facility Information (As Builts, Record Drawings, etc.), which may be on file at the Medical Center is available to the A/E for his information and use by arrangement with the Project Staff Engineer at the Medical Center. Copies of these documents may be obtained by written request to the COTR (72 hours notice should be allowed for Charleston VAMC, Engineering Service to respond to a request). Documents which do not pertain to the specific task order shall not be supplied without proper justification. The A/E should arrange to review what relevant information may be available and then make separate arrangements for its reproduction. The VAMC (or the A/E using VAMC equipment and materials) will provide limited copies of information on file (up to 20 sheets of drawings) at no charge. Reproduction beyond that shall be arranged by the A/E at his expense. Available project information based on VAMC approved submittal data: Record drawings of existing related construction, site, & adjoining buildings As-Built Drawings (Original and AutoCAD versions) of most recent major renovations XII. DETAILED SCOPE OF A/E SERVICES to be provided shall be as stated at the beginning of this attachment and as follows: DESIGN PERIOD AND CONSTRUCTION PERIOD SERVICES PRE-DESIGN SERVICES FIELD WORK: Field work by the A/E shall be scheduled in advance with the Medical Center. The A/E will be required to coordinate with any clinical programs and schedules and to fully respect patient and staff privacy. The A/E may expect full and free access to public, common, and building service areas during normal business hours. Access to departmental and clinical areas may be limited, may require escort, and shall be coordinated in advance through Engineering Service. A Medical Center escort cannot be provided at all times. Escorts will be required when working in sensitive areas and must be coordinated in advance of the requirement. The A/E will be provided Identification that must be displayed when working unescorted. After-hours access will be arranged only when mutually convenient with both the A/E and the Medical Center. Normal business hours are 7:30 AM until 4:30 PM, Monday through Friday, excluding Federal Holidays. Local exceptions exist in many departments. Access will be provided to all available facility documentation. Drawing documentation (electronic and hard copy) is reasonably complete except for work in progress. Prior Reports and Analysis are scattered and often dated. Prior coordination and scheduling will be required for access to all information sources. CODES AND ANALYSIS REQUIREMENTS: The primary code in use at the VAMC is the most current edition of NFPA 101, Life Safety Code. The Uniform Building Code remains the Code of Record for the VA, though seldom referenced. Other codes shall be as listed above and found at www.cfm.va.gov/TIL/cpro/cpTop01.doc. DESIGN SERVICES (General Requirements). Provide A/E Design Services including Field Investigation, and Design (Conceptual 20%, Schematic 35%, and Design Development 65%) as may be required and Contract Document Preparation 100%. These services for each phase shall include but not be limited to: SURVEYS AND TESTING: The A/E will assess any suspected hazardous materials by reviewing prior surveys and verifying with spot tests. The Environmental Engineer and testing lab shall be approved by the VAMC prior to the start of this phase of the work. PROGRAMMING: The VA will provide the general direction and intent of the work. The A/E will review this material, verify field conditions and offer alternate methods of accomplishing the intent within the Government s constraints. FIELD INVESTIGATION: Perform all site visits, field investigations, as built verification and existing condition verification necessary for execution of the design and preparation of construction documents. As built and existing condition information provided to the A/E is not guaranteed to be error free. The A/E is expected to become reasonably familiar with the area of the work. DESIGN INTERVIEWS AND CONFERENCES: Provide all visits and conferences necessary for the A/E to verify the interests of concerned parties are being addressed. Allow time to resolve issues resulting from the design during bidding and construction. DESIGN SUBMITTAL REVIEWS The A/E will be required to make presentations of each submission on site. The A/E will be required to meet with the Medical Center after each submission to review his work with the Medical Center, clarify questions regarding his work and receive comments and discuss any concerns arising out of the review. He may expect to discuss his work and receive comments for a period not to exceed 8 hours at each submission. DESIGN SERVICES SPECIFIC REQUIREMENTS DESIGN DEVELOPMENT Conceptual/Schematic Design (DD1) Submission. Provide conceptual data to locate and describe the intended design, highlight available options with the design, verify existing conditions, and to establish the dialogue with the Medical Center necessary for developing a design. Material shall be suitable for discussing various options and/or limitations that might be present in the work. A/E Provides a submittal of investigation findings and recommendations, 5 copies. Submittal will include: Building plans showing and locating the areas and the extent of the work, including paths of access including material delivery and removal, limits of work (partitions) and significant constraints to the work (such as ongoing medical staff work and patient care in portions of 4BS,4BN, 3BS & 3BN) and including areas that move to a different floor area during an early project phase (ex., Infusion Clinic to go to 4BN, displaced from 4BS). Sketches of design concepts showing suggested overall layouts (ex., rough layout of patient rooms and toilets including initial suggestions and locations of supporting spaces) and more detailed (larger scale or more precise detail)for work of a complex or controversial nature. Detailed sketches of routine work are not required. A broad projection of costs and an outline of trades and services to be considered in future detailed cost estimates. Construction coordination issues and Management Plan that may be needed to maintain operations during construction. This will be developed jointly with Medical Center Personnel and prepared and presented by the A/E. It shall include the following: patient circulation; utility/other outages; material handling and lay down; customer flow issues and solution recommendations; project construction phasing and durations; construction period testing/inspection requirements; temporary tuberculosis isolation rooms; construction route for material delivery and removal; impact of utility system demo/relocation on other floor(s). Utilize sketches developed in 3.1.2 when applicable to communicate and aid discussions. Neat, legible, freehand, single line, to scale drawings are acceptable at this stage. Reproducible or electronic files of any drawings or narratives shall be submitted. Refer to Program Guide, PG-18-15, Volume C, for submission requirements for Schematics, DD, and CD. Color schemes and interior finishes, with recommendations. Results of Infection Control Risk Assessment as referenced in Center Policy Memorandum No. 138-03-ATTACHMENT A-1. Provide 5 copies of bound design analysis and subsequent narrative for the disciplines as follows: Architectural narrative includes location, access, site impact, interior layout and design, and any phasing information. Mechanical narrative includes air distribution /conditioning requirements for each typical room, equipment locations and controls. Exhaust systems shall be evaluated to ensure the ability to exhaust areas for current criteria of new space/use requirements. Electrical narrative includes normal power, emergency power, computer network/telecommunications, Cable TV, medical gas alarm system, fire alarm system, nurse call, biomedical system (e.g. telemetry), monitoring equipment and control system. Plumbing narrative includes domestic water, sewer drains, medical gases, and fire protection. Utilize existing vent risers and waste water where available and verify adequate supply. All fixtures shall be configured to be fully ADA compliant to VA standards of compliance. Presentation of findings above, to the Medical Center, on site. DESIGN DEVELOPMENT 35% (DD2) Submission. The A/E will develop the schematic concept through visits to the Medical Center and discussions with its staff. The submission shall be made during the early stages of design where the main features of the work are determined, but where changes can still be made with minimal effort. The A/E shall use this submission to verify and confirm the viability of the concepts previously discussed during the DD1 submittal. They shall also define the building system issues required to support the proposed design (HVAC, Electrical, etc.) Submission requires: 3.2.1) To-scale formal drawings of the main features of the work including the location, extent, and concepts being implemented. 3.2.2) Concepts and schematics from all disciplines required to support the design with emphasis on technical issues that may be in question or controversial. 3.2.3) Equipment and Furnishings Layouts. Demonstrate by equipment layout out drawings that the A/E s plans support the Government s intended use. Incorporate any equipment or furnishing plans that may be provided by government venders or use generic, if specific items are not established. If specific requirements are not available from the end user, a generic basis of design will be shown for the end user to comment on and respond to. 3.2.4) Preliminary Finish Schedule. A draft finish schedule to show the designers intent and to give the designer a frame work for discussing finishes with the Medical Center s Interior Design Coordinator. 3.2.5) Code Analysis. A summary of the code compliance rationale (thought process) used for the design shall be submitted. This shall preferably be on the drawings themselves but may be in a separate narrative if necessary. Codes being used shall be indicated for each discipline even if work for that discipline has not advanced to a state permitting code analysis. Rated assemblies will be shown graphically. 3.2.6) A refined projection of costs. A detailed, preliminary cost estimate reflecting a quantity take off including labor and materials and based on an established reference (Means, etc.). Coordinate format prior to preparation. 3.2.7) Electronic Drawing Files of key drawings and narratives. 3.2.8) Any technical analysis, product literature or evaluations used to derive the information submitted above. 3.2.9) Outline specifications showing sections intended for use. 3.2.10) Reproducible. A clean, clear copy shall be submitted of all drawings, narratives, etc. to enable the VAMC to reproduce any additional copies that it may require beyond those required in the submission, and to permit comments to be noted and reproduced. Clean, clear, standard plotted sheets generally suffices. 3.2.11) SUBMISSION REQUIREMENTS: The package submitted to the VAMC shall include: 3 sets of full size plans, 35% complete, showing basic plan for each discipline involved, with all review comments accounted for. 3 sets of half size sets of plans, showing basic plan for each discipline involved. 1 copy of electronic data. This should be made accessible via PDF to all on the design team if requested. 3 sets of detailed construction cost estimates. 1 copy of suitable reproducible. 3 copies of marked up list of Master Construction Specifications showing sections intended or used on this project. 3 copies of Identification of Deductive Bid Alternates: approximating 10% of construction. Presentation to Medical Center, on site. CONSTRUCTION DOCUMENTS 65% (CD1) Submission. 3.3.1) Developed architectural drawings addressing all significant aspects of the design. Fully coordinated and detailed drawings are not expected; identification and delineation of all issues and aspects of the work for all disciplines are required. Although fully coordinated and detailed drawings are not expected and routine detailing is not yet required, for assurance of rapid turnaround at the 100% submission it would be prudent. 3.3.2) Preliminary drawings of all mechanical, electrical, and technical systems showing sources of utilities and services and distribution of all services. Scope of work should be clearly shown; significant technical problems should be addressed and resolved. Although fully coordinated and detailed drawings are not expected and routine detailing is not yet required, for assurance of rapid turnaround at the 100% submission it would be prudent. 3.3.3) Informational plan for functional user: A separate plan showing only the features significant to the end user is required. Such features might include but not be limited to floor plans showing room names and numbers, intended equipment and furnishings, power receptacles, data jacks, etc. This product is an important step in quality control and should not be omitted. 3.3.4) Any technical analysis, product literature or evaluations used to derive the information submitted above. 3.3.5) Reference to code issues or survey findings related to the work. 3.3.6) A Detailed cost estimate reflecting a quantity take off including labor and materials and based on an established reference (Means, etc.). Coordinate format prior to preparation. 3.3.7) Electronic Drawing Files of the primary drawings, narratives, and cost estimates. 3.3.8) Specification Outline updated, with marked up sections of any unusual or controversial areas only. 3.3.9) FINISHES: Verify finishes required in areas of work. Prepare finish schedule including colors and product where applicable. Provide three color boards (Interiors, Project Manager, Contractor). Work shall comply with the Medical Center s current interior design master plan and be coordinated with the Medical Center s interior design coordinator. 3.3.10) SUBMISSION REQUIREMENTS: The package submitted to the VAMC shall include: 6 sets of plans (3 full size, 3 half size), 65% complete, with all review comments accounted for. 3 sets of detailed construction cost estimates. 3 copies of sample edited and marked-up VA Master Specifications of each discipline and VA Master Specification Table of Contents. Include brief descriptions of project deduct alternates, in the amount of 10% of the construction estimate. Proposed construction phasing, and estimated phase durations, will also be included. 3 alternative Color Boards, showing all interior finishes, with recommendations. Presentation to the Medical Center, on site. CONSTRUCTION DOCUMENTS 100% (CD2) Submission. This submission shall include: 3.4.1) Completed sets of construction documents for final VAMC verification prior to final reproduction. 3.4.2) Updated Informational plan for functional user: 3.4.3) Updates to any code, technical analysis or evaluations previously submitted. 3.4.4) A Final detailed cost estimate reflecting a quantity take off including labor and materials and based on an established reference (Means, etc.). 3.4.5) The final original cover sheet for signatures. 3.4.6) Final complete Electronic Files. See format information elsewhere in the full copy of this attachment. Shall include plans, specifications, narratives, estimates and other key documents. To be updated at Final Submission if changes occur. 3.4.7) Updates to finishes. Highlight changes to previous submissions for the benefit of the reviewer. Update previously submitted color boards. 3.4.8) Specifications. Final edited specifications for review. 3.4.9) Reproducibles: Shall be submitted of all drawings to enable the VAMC to reproduce any additional copies required and to permit comments to be noted and reproduced. 3.4.10) SUBMISSION REQUIREMENTS: 10 copies of all documents shall be submitted except: 6 sets of plans (3 full size, 3 half size), with all review comments accounted for. 3 sets final construction cost estimates. 1 copy electronic data. 1 copy Mylar Cover required for signatures 1 copy Suitable Reproducible 5 sets complete typed specifications. They will include all comments received from legal and technical review, and VISN Fire and Safety Engineer review (if applicable). 2 sets submittal checklist 2 copies of the brief description of work for inclusion in construction solicitation. Deductive alternatives, in the amount of 10% of construction estimate, will be provided. 3 sets of color boards, to reflect all interior finishes approved by the Medical Center during CD1 submission reviews. Presentation to the Medical Center, on site. Upon completion of all revisions by the A/E and final approval of the Contracting Officer, the following items shall be submitted: 3.5.1 1 set original reproducible plans plus a copy on CD disk in AutoCAD 2014 format (See Section B, Paragraph A.10 of the Engineering Service AutoCAD Guidelines for electronic submittals). 3.5.2 1 set complete typed reproducible specifications plus a copy on CD in current revision of Microsoft Word (See Section B, Paragraph A.10 of the Engineering Service AutoCAD Guidelines for electronic submittals). 3.5.3 3 copies of the final description of work including base bids and all deduct alternates. Each item shall have cost and time included for that item of work. 3.5.4 Upon Medical Center approval and signature of plans described in paragraph 3.5.1 above, provide: Complete sets of construction plans and specifications to the Contracting Officer. 1 half size set of construction plans (bound) to the Project Manager at the VA. 3 complete sets of half size drawings. 25 CDs, in TIF, PDF, and DOC format, containing drawings and specs as required by the contracting officer. Construction Document Drawings will be prepared as follows: 3.6.1 All Construction Document Drawings will be plotted onto 30X42 inch, 4-mil MYLAR, with border lines @28X40 inches, and as indicated in Handbook PG-08-15, provided. 3.6.2 The A/E will utilize the VA provided AutoCAD Cover Sheet Drawing (VA-COVER.DWG), Title Block Drawing (VABORDER.DWG), Finish Schedule Drawing (FINISH.DWG) and the Signage Schedule Drawing (SIGNSCH.DWG) for the project drawings. The Cover Sheet includes an area for the signature of the Medical Center Director, Facilities Service Line Manager, and Service Chiefs involved; an index of the drawings; and key drawing. General notes and other pertinent items will be provided by the A/E on the cover sheet. 3.6.3 The A/E will utilize copies of the VA AutoCAD As-Built Plans as listed in the Engineering Service AutoCAD Guideline Index. The A/E may utilize copies of the VA Record Drawings as listed in the Engineering Service Record Drawing Listing. 3.6.4 The A/E will follow the Engineering Service AutoCAD Guidelines in the development of the Project Construction Drawing Documents, Record Drawing Documents and As-Built modifications. In particular, the following sections apply: Section B: Engineering Service AutoCAD Project Requirements for Architects/Engineers. Section C: Group No. 1 Plotting Configurations Section E: Plot Configuration Parameters (PCP). DESIGN ELEMENTS OF SPECIFIC CONCERN include: ARCHITECTURAL: Design areas where patch and repair is necessary including ceilings and walls due to removal of piping during replacement and dead leg removal. Work should match existing finishes and ceiling tiles. SPECIAL CONSTRUCTION (SEISMIC): Seismic restraint requirements for non-structural Components. MECHANICAL DESIGN: Mechanical design will be minimum. CIVIL ENGINEERING: Civil design will be minimum, if at all. PLUMBING DESIGN: Plumbing design involves eliminating all dead legs in hot and cold water piping systems to provide a maximum length not greater than two pipe diameters from the branch, riser or main that it is connected too. If terminated with a valve followed by a cap, provide means to eliminate trapped fluid between the valves and cap, plug or flange. Design fixture replacement that includes sensor operated faucets with built in timed operation for any fixtures deemed non routine or low use. In conjunction with the timed faucets, a motorized dump valve could be added at select remote located service sinks. The sinks would be controlled based on nearby temperature sensors set to open the valves and dump into the adjacent service sink until the water temperature is within the required temperature range. Design continual monitoring of the oxidant residual level in six diverse locations. Design required ASSE certified thermostatic mixing valves required to limit the outlet water temperature to 110 degrees Fahrenheit. Any fixture without the thermostatic mixing valve will need to have one added to it. Design laminar flow outlets at all faucets in lieu of aerators. Design temperature sensors that are trended and continuously monitored, installed at the most remote hot and cold water risers and the end of the most remote branch. Design the installation of branch level intercept piping that would allow the VAMC to isolate specific hot or cold branches and only eradicate certain areas as required; Single temporary connection point. For the domestic cold water system, Design circulation back to the source location for the entire building. Provide insulation on all domestic cold water piping throughout the building, including above ceiling, piping basement, behind walls and in chases. ELECTRICAL DESIGN: The electrical design includes low voltage monitors, sensors and motorized dump valves for fixtures. Design equipment location and connections to maximize performance. COST ESTIMATING: Detailed line item cost estimates showing materials and labor with appropriate markups for each shall be provided. The contractor s contingency, overhead, and profit shall be listed as separate items and not pro-rated into the line items. Subcontractor s markups may be handled as convenient. Appropriate mark-ups for set-asides need to be evaluated in the cost estimating process with consideration to any recommendations by VA engineering. FACILITY CONSIDERATIONS - The A/E design shall take in consideration that this facility is a working hospital. All construction work must be design to allow the least interruptions/impacts to the facility. Design should show phasing as required to allow the users adequate use of adjacent spaces during construction. Swing space for moving staff out of the construction area shall be considered by the A/E. Constructability by construction contractors will be of the upmost concerns. BID ALTERNATES - Each Bid alternate shall stand on its own without affecting the base bid. HAZARDOUS MATERIAL ANALYSIS A thorough analysis by the A/E and a qualified testing agency shall be performed in all scope areas to test for hazardous material, such as lead, asbestos, PCB, mercury, etc. Any found shall be annotated in the design documents for remediation/abatement. DESIGN BUDGET The A/E shall design this project for an anticipated construction budget up to $8,000,000 for base bids. BIDDING AND NEGOTIATION will be accomplished by the VAMC. The A/E shall be available to respond to questions concerning his design which evolve from this process at no additional cost to the government. Errors and omissions in the contract documents identified during pricing and bidding shall be corrected at no additional cost to the government. Changes in scope requested by the government during bidding shall be subject to negotiation. The A/E shall provide the agreed upon number of reproduced plans and specifications to the VAMC for the VAMC's distribution and use. Electronic media may be required for the VA s use during bidding; this shall be established during negotiations and provided under this contract. All facets of the work shall be prepared to standards required for competitive bidding where the bidders are not required to visit the site. CONSTRUCTION PERIOD SERVICES. FIELD SERVICES. Will be requested on an as-needed basis using a unit price established by mutual agreement during negotiations. The basis for the unit price will be Construction site visits and shall be based on monthly visits during the period of construction of 4 Hrs each. Additional 4 hr visit shall be allowed for a pre-construction conference, punch list inspections, and final inspections. Each visit shall include preparation of field reports and related administrative activities. The 4 Hrs nominally includes local travel time to and from the site; travel costs in excess of this shall be factored into the final unit price during negotiations. It is suggested that the unit be per visit. Not all visits may be used; no compensation will be made for visits not used. Additional visits if required will be paid at the unit rate. Field Services may be requested for other than the evaluation of construction. Field Visit Services for construction shall consist of: 6.1.1) VERIFICATION OF DESIGN INTENT: assurance that all construction work complies with the designers intent. 6.1.2) VERIFICATION OF POST CONSTRUCTION AS-BUILT CONDITIONS: The A/E shall review the contractors notes of changes in the field for accuracy and content and shall advise the VAMC of readily apparent problems, particularly with utility, wiring, piping, etc. The A/E shall assist the VAMC in maintaining a second record of field changes if it is felt the contractor s work is not sufficient. 6.1.3) PAY REQUESTS: The A/E shall assist the VAMC with the analysis of pay requests if requested by the VAMC. The VAMC will process and administer all payments to the contractor. 6.1.4) MEDIATION: The A/E shall provide a third party non-binding opinion in the event of minor disagreements between the contractor and the government. Serious disputes are addressed elsewhere in the A/E s contract. 6.1.5) CONTRACTOR S REQUEST FOR INFORMATION AND COST PROPOSALS: The A/E shall review the Contractor s requests for information and cost proposals for construction change orders when requested by the Resident Engineer. The A/E reply regarding his review of cost proposals and his recommendations shall include an independent breakdown of costs in detail, quantities and unit prices and shall cover both additions and deductions of labor, materials and equipment. OFFICE SERVICES. Submittal review services will be required to insure that submitted materials comply with the designer s intent. The VAMC will administer the submittal reviews by collecting comments from VAMC staff, approve/disapprove submissions, and track submissions with the contractor. POST CONSTRUCTION SERVICES Requirements for Post-Construction Up-dating of the Medical Center s AutoCad As-Built Drawings. Record Drawings: The A/E following construction will review the notes kept by himself, the VAMC, and the contractor during construction and update the Construction Documents to reflect the work actually built. This shall be done in accordance with the policies, procedures, cited elsewhere in this attachment. As-Builts: The A/E, following construction and Record Drawing completion of the project, will up-date the Softdesk/AutoCaD As-Builts to reflect all pertinent project modifications. The up-dating will consist of electronic data revisions in accordance with the Engineering Service AutoCad Guidelines. Up-dating of VA As-Built drawings a) VA As-Built Drawing files will be modified by the A/E to up-date affected As-Builts with project modifications. b) The A/E will provide disks and the current applicable drawing files will be copied onto them by Engineering Service. c) The A/E will create the directories, as required, to maintain External Reference path integrity (i.e., without the project number) in compliance with the appropriate Engineering Service AutoCaD Guidelines. d) The A/E will modify the As-Built Drawings (as listed in 2. above) in compliance with the appropriate Engineering Service AutoCaD Guidelines. e) Modified As-Built drawing files will be returned to the Government in the same configuration as the A/E received them. *** END *** Address Potential Legionella Issues Phase II 534-18-104 The AE will receive a total of 12 MONTHS to complete the design. The design time does not include Government reviews between the stages. All interested firms who have experience in this type of Architect/Engineer Design Service may submit four (4) hard copies of the SF-330 form which can be found at the following website: http://www.gsa.gov to Cassaundra Mulligan, Contracting Officer, 109 Bee Street, Charleston, SC 29401-5799 no later than 4:00 PM EST on July 31, 2017. One (1) CD, which contains the SF 330s, is also required. This requirement is issued as a Service-Disabled Veteran-Owned Small Business Set-Aside. The NAICS Code is 541310, and the SBA size standard is $7.5 Million. All work shall comply with the current VA Master Specifications and Standard Details. In order to be considered for an award, the A/E must be registered in SAMS at https://www.sam.gov. SAMS includes the CCR and ORCA registration. The A/E must also be visible in the VIP pages at http://www.vip.vetbiz.gov. SF 330 Supplemental Information Architect Evaluation Criteria for Project 534-18-104, ADDRESS POTENTIAL LEGIONELLA ISSUE PHASE 2, RHJ VAMC, CHARLESTON, SC In addition to the submission of the SF 330, firms are required to provide the following supplemental information as part of the total submission package. Submitting firms are to provide four (4) bound hard copies with tabs and two (2) CDs which contain the SF 330s and the following documents. 1. Professional qualifications necessary for satisfactory performance of required services. a) Submission requirements: Submit personal resumes that best demonstrate the firm's professional qualifications, including specific licenses and registrations relevant to the solicitation requirements. Complete and submit a summary disclosure for each discipline, principal, project manager, and other support personnel, for up to 10 employees covering disciplines offered, that will handle work for the solicited task order. Each resume package may not be longer than two (2) pages in length. b) Basis of Evaluation: Evaluation of professional qualifications will include but is not limited to the subjective assessment of the firm's individual resumes as required in the solicitation. Firms unable to demonstrate required qualifications necessary to perform designs may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. Higher ratings for this criterion may be given when the firm's specific personnel demonstrate excellent or very good credentials, above and beyond those usually expected. 2. Specialized experience and technical competence in the type of work required. Specialized experience pertains to the types, volume and complexity of work previously or currently being performed by a firm that is comparable to the types of work covered by this requirement. a) Definitions: Specialized work means construction and design projects similar in project scope, size, construction features, dollar value and complexity of that listed in the RFP. Projects submitted outside these parameters will be assigned lower ratings. Similar dollar value is considered construction projects of One Million dollars ($1,000,000) and greater. Similar complexity is considered projects of an operational likeness to that listed in the RFP Within the past five (5) years shall mean from date of SF 330 package submission to five (5) years prior. b) Submission requirements: Submit up to three (3) relevant projects, accomplished within the past five (5) years that best demonstrate your relevant experience to the solicitation requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. Complete and submit a data summary sheet for each project. Each project data package may not be longer than two (2) pages in length and may include verbiage, graphics and photos. Projects may include Federal, State, or local Government, as well as private industry projects. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy. c) Basis of Evaluation: Evaluation of specialized experience will include but is not limited to the subjective assessment of the firm's resume of the type of work required in the solicitation. Firms unable to demonstrate proven competence to perform these kinds of projects may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. Higher ratings for this may be given when a proposal demonstrates project examples of excellent or very good examples of projects relevant to the solicitation. 3. Capacity to accomplish the work in the required time. Identify the firm s past and present workload, and convey the understanding of being able to handle several design projects concurrently and within prescribed deadlines/constraints. a) Submission requirements: Provide a narrative, (maximum of one 8 ½ X 11 page) that discusses the firm s approach to accomplishing multiple concurrent design projects with emphases on meeting prescribed deadlines. b) Basis of Evaluation: Evaluation of this factor will be a subjective assessment of the firm s ability to clearly demonstrate an understanding of multiple design project goals and requirements set for the completion of the projects within prescribed deadlines. Higher ratings may be given for this factor when information provided exceeds the minimum requirements. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality work, and compliance with performance schedules. Past performance relates to how well a firm has performed on substantially completed projects, within the past five years. a) Definitions: Past performance is a measure of the degree to which a firm satisfied its customers in the past and complied with applicable laws and regulations. Government agencies are defined as local, state, and federal entities. Higher ratings may be given for work performed on VA Medical Center campuses. Private industry is defined as non-governmental clients. "Within the past five (5) years" shall mean from date of proposal submission to five (5) years prior. The term "substantially complete" shall mean a fully designed project with construction of the facility/project more than 80% complete. b) Submission requirements: Submit up to three (3) relevant projects design complete or substantially construction complete within the past five (5) years and best demonstrates your relevant experience to the solicitation requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. Complete and submit a project data summary sheet for each project. Each project data package may not be longer than two (2) pages in length. Projects may include Federal, State, or local Government, as well as private industry projects. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy. Provide a list of all projects accomplished within the last 7 years at VAMC s including point of contact and brief description of project. Questionnaires. Firm is at risk of receiving a lower rating if fewer than three (3) Past Performance Questionnaires are received. c) Basis of Evaluation: Failure to provide requested data or to provide an accessible point of contact (POC) may negatively impact a firm's rating. The evaluation of past performance will include but is not limited to the assessment of the firm's commitment to customer satisfaction, timely delivery of quality work, the firm's record of conforming to specifications, successful implementation of quality control procedures; adherence to schedules; and history of reasonable and cooperative behavior. Firms unable to demonstrate proven competence to perform projects similar to the requirements of the solicitation may be considered ineligible for award. Higher ratings for this may be given when a proposal demonstrates excellent or very good ratings for past performance and customer satisfaction on projects relevant to the solicitation. 5. Location in the general geographical area of Charleston, SC, (within a 200 mile radius) and knowledge of the locality of the Ralph H. Johnson VAMC: a) Definitions: Knowledge of the locality is defined as familiarity of applicable codes and regulations in place for the area. b) Submission requirements: Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's location. c) Basis of Evaluation: Firms that are outside a 200 mile radius of the Ralph H. Johnson VAMC, Charleston, SC will be given a lower rating than those firms within that distance. Higher ratings for these evaluation criteria may be given as follows: § Firms that can be on site at the Ralph H. Johnson VAMC, Charleston, SC within 120 minutes will be given a higher rating. § Firms that can be on site at the Ralph H. Johnson VAMC, Charleston, SC within 60 minutes will be given the highest rating. A subjective determination of the firm's statement of knowledge of the locality and how it was obtained relative to the requirements of this solicitation. 6. Implementation of the Design Quality Control Program. Identify the roles and responsibilities of the major personnel of the firm and depict the understanding and implementation of Quality Control procedures for task orders. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. a) Submission Requirements: Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's approach to the task orders with emphasis on the envisioned role of the design team with regard to Quality Control. b) Basis of Evaluation: A subjective determination of the firm's statement of knowledge of Quality Control and how it will implement Quality Control procedures relative to the requirements of this solicitation. Higher ratings may be given for this factor when information provided exceeds the minimum requirements. 7. Program management process/plan for handling Ralph H. Johnson VAMC projects. Identify the roles and responsibilities of the major personnel of the firm and depict the lines of communications envisioned for the design tasks between the firm and with the Government. a) Submission Requirements: Provide the relationships between the firm and all partners and/or subcontractors/consultants to be associated with this solicitation and identifying each of the firms key positions/personnel and their role in managing work for these task orders. Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's Program management approach to the task orders. b) Basis of Evaluation: Evaluation of this factor will be a subjective assessment of the firm's ability to clearly demonstrate an understanding of the task order projects goals and requirements and set forth a realistic approach for the design of the task order projects. Higher ratings may be given for this factor when information provided exceeds the minimum requirements. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. a) Submission Requirements: Provide a narrative (maximum of one 8 ½" x 11" page) that addresses any claims, disputes, lines or judgments against your firm for instances where there have been design errors, deficiencies and/or omissions AND the steps your firm took to resolve the issues and the ultimate outcome. Provide a statement if item 8 above is not applicable to your firm. b) Basis of Evaluation: Evaluation of this factor will be an objective assessment of the firm's ability to provide clear, concise, accurate design drawings and specifications free from design errors, deficiencies and/or omissions AND a subjective assessment of how well the firm managed situations when these issues were encountered. Higher ratings will be given to firms that have not had any of the issues mentioned in item 8 above; however, firms with no performance history will be scored lower than those firms with significant performance history and none of the issues in item 8. A lower rating will be given to firms that have experienced issues that resulted from design errors, deficiencies, and/or omissions, but resolved the matter to the satisfaction of the Government and/or customer. Firms that were unable to amiably resolve issues that arose from design errors, deficiencies and/or omissions will not be considered eligible for competition. 9. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. a) Submission Requirements: Provide a narrative (maximum of one 8 ½" x 11" page) that addresses any partnering, teaming, or subcontracting relationships your firm has and how long members within your firm have worked with one another b) Basis of Evaluation: Evaluation of this factor will be a subjective assessment of the firms relationships and how well the firm works as a team within their organization and with other partners, teams, and subcontractors. Higher ratings will be given to firms that clearly demonstrate organizational health and cooperation with other teams, partners, and Government and industry personnel (customers). A lower rating will be given to firms that cannot demonstrate organizational health and cooperation with other teams, partners, and Government and industry personnel (customers). THIS IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED. THE GOVERNMENT WILL NOT BE HELD LIABLE FOR CONTRACTOR COSTS INCURRED IN THE PREPARATION OF SF 330 s OR SUBMISSIONS. NOTE: SF-330 packages shall be submitted on JULY 31, 2017 at 4:00 PM local time to the below cited contracting office address. Contracting Office Address: DEPARTMENT OF VETERANS AFFAIRS RALPH H. JOHNSON VA MEDICAL CENTER ATTN: CASSAUNDRA D. MULLIGAN, CONTRACTING OFFICER 109 BEE STREET CHARLESTON, SC 29401-5799 (843) 789-7504 - Cassaundra.mulligan@va.gov Place of Performance: Ralph H. Johnson VA Medical Center, Charleston, SC.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/ChaVAMC/VAMCCO80220/VA24717R0740/listing.html)
- Document(s)
- Attachment
- File Name: VA247-17-R-0740 VA247-17-R-0740.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3647373&FileName=VA247-17-R-0740-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3647373&FileName=VA247-17-R-0740-000.docx
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA247-17-R-0740 VA247-17-R-0740.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3647373&FileName=VA247-17-R-0740-000.docx)
- Place of Performance
- Address: RHJ VAMC CHARLESTON, SC;109 BEE STREET;CHARLESTON, SC 29401-5799
- Zip Code: 29401-5799
- Zip Code: 29401-5799
- Record
- SN04572640-W 20170712/170710235036-aa0516e181c752f7f7de6c605cddb6a6 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |