MODIFICATION

Y -- MATOC Solicitation - Only Open to existing USPFO for Kansas MATOC Contractors - Forbes Multiple Facility Repair Project # 2 FY17 - Solicitation 3 - Solicitation 3

Notice Date
6/15/2017
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, National Guard Bureau, 184 MSG/MSC, KS ANG, 52955 JAYHAWK DRIVE, SUITE 153, McCONNELL AFB, Kansas, 67221-9013, United States
 
ZIP Code
67221-9013
 
Solicitation Number
W912JC-17-R-0005
 
Point of Contact
Karen L. Robben, Phone: 7852741273
 
E-Mail Address
karen.l.robben.civ@mail.mil
(karen.l.robben.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Chapter 5 Amendment 2 to Solicitation W912JC-17-R-0005 is issued to provide answers to questions and to add Option 4, Install of Electrical and Air System in the Building 662 Bay. Question: What type of exisitng pipe is connected to the existing curb inlet? What is the size of the existing pipe connected to existing curb inlet? What is the pipes oreintation? Answer: It is corrugated 16" steel pipe and it exits out the back curb inlet towards the fence. Question: Below are the original specs, but the addendum changes it to have no copy. Questions after that. 0004:Install Digital Sign at Building 2005. 1 @ 68" x 140" x 16" (D/F, R/F Monument), Includes 3"reveal & 8" Base, Internally illuminated, painted 2 standard colors, Copy backed w 3/16" white plex, logo w F/S vinyl, Built to receive 2 EMC cabinets, Provided & installed by others, White LED's & power supply, 2 Pole / Base Mounted. Display Specifications, Product Line LED Pixel Pitch: 20.0mm, Matrix Size: 48 x 112, Viewing Area: 3' 1 13/16" x 7' 4 3/16", Cabinet Size: 3' 1 13/16" x 7' 4 3/16" x 7 7/8, Color: RGB, Color Processing: RGB 281 Trillion Levels-M, LED's per pixel: Red: 1 Green: 1 Blue: 1, Character Size: 5.5 Inches, # of Lines/Char. Line: 6 line(s), 18 characters, Brightness: 9000 NIT's (+-5%), Viewing Angle: 140 Degrees Horizontal, Display Configuration: Double Face (2 Cabinets - Master/Slave), Maintenance Door: Front, Cabinet Design: Module, Display Net Weight: 213.85 lbs. per face (+/- 10%). Electrical & Venting Requirements: AC Power Required: 120V, Total Boot Up Amps*: 13.3, Regular Operating Amps*: 3.85, Venting Requirement*: 253.81 CFM, provide pair of 2" conduits back to 2005 for power and comm. Installation / Fabrication: install concrete pad that will need to be poured for the new sign. The sign will also attached to a 4" metal pole that will be cemented in the ground. Do they envision the base to be brick to match the building, a metal pole cover or just concrete? Do they have color preferences for their two colors? It would appear from two runs of conduit that they may want fiberoptic communications. If so, how long is the run from the programming computer and where is it in the building? For example, does an electrician have to pull cable through ceilings, walls, etc.? Other forms of communications are available, wireless data (receiver at the sign) connecting to programming computer and available to schedule from a mobile phone, or radio frequency? The 4" pole specified may or may not be sufficient for the wind load. Answer: The digital display specification is what is critical. The cabinet design may vary. No lettering and a minimal cabinet. Part of this is for the sign company to provide a design or the General to coordinate work scopes. If something is inadequate for wind load, what is recommended? The may use existing footing or create a new. If a site visit is needed the MATOC Contractor may coordinate it with Maj Noah Diehl. Question: What is the planned size of the pre-cast box culvert for Item 002? Answer: --Based on the site visit the existing curb inlet is to be eliminated and new area inlet is to be installed. Use an area inlet assembly 2'-3" x3'-3" would be my recommendation. Question: Does this pre-cast box need to have any rip-rap placed at the ends and what class does it need to be? Answer: n/a Question: Does the pre-cast box need any geotextile fabric placed and what kind of fabric is needed? Answer: n/a Question: Are there any pre-cast drawings available with elevations to provide to suppliers? Answer: There are no drawings or elevations. We could shoot the bottom of existing? Question: What are your planned excavations for the digital sign? Answer: --Sign is to be place on a concrete slab. My recommendation is to also place 6" AB-3 under slab. Best guess 3'x8'x1'=24CF roughly 1CY Question: What are the planned size of the demolition of the existing sign and pedestal's? Answer: sign one is 2'x6' remove concrete and base material to a depth of at least 6". Cover with topsoil. Pedestal two if not used for the new sign remove completely. 3'x9' and depth is at least 3'. Question: Where is the planned disposal site for demolished material on Forbes Field from the work area? Answer: Haul concrete offsite. Road soil excavation will be placed at the north end. Question: What is the expected depth of the existing concrete for the ramp repairs? Answer: see attached UFC. Depth may vary 6" to 8". Question: What type of subgrade prep is needed for the full depth patches in the ramp area? Answer: There are no full depth patches on ramp area. Question: What is needed for the special training needed to be on the ramp for the full depth patching, I cannot find what is needed? Answer: the training is security related. It goes into depth on how to operate on a Aircraft ramp it will be completed on the notice to proceed. Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2017-06-15 15:05:00">Jun 15, 2017 3:05 pm Amendment 2 to Solicitation W912JC-17-R-0005 is issued to provide answers to questions and to add Option 4, Install of Electrical and Air System in the Building 662 Bay. Question: What type of exisitng pipe is connected to the existing curb inlet? What is the size of the existing pipe connected to existing curb inlet? What is the pipes oreintation? Answer: It is corrugated 16" steel pipe and it exits out the back curb inlet towards the fence. Question: Below are the original specs, but the addendum changes it to have no copy. Questions after that. 0004:Install Digital Sign at Building 2005. 1 @ 68" x 140" x 16" (D/F, R/F Monument), Includes 3"reveal & 8" Base, Internally illuminated, painted 2 standard colors, Copy backed w 3/16" white plex, logo w F/S vinyl, Built to receive 2 EMC cabinets, Provided & installed by others, White LED's & power supply, 2 Pole / Base Mounted. Display Specifications, Product Line LED Pixel Pitch: 20.0mm, Matrix Size: 48 x 112, Viewing Area: 3' 1 13/16" x 7' 4 3/16", Cabinet Size: 3' 1 13/16" x 7' 4 3/16" x 7 7/8, Color: RGB, Color Processing: RGB 281 Trillion Levels-M, LED's per pixel: Red: 1 Green: 1 Blue: 1, Character Size: 5.5 Inches, # of Lines/Char. Line: 6 line(s), 18 characters, Brightness: 9000 NIT's (+-5%), Viewing Angle: 140 Degrees Horizontal, Display Configuration: Double Face (2 Cabinets - Master/Slave), Maintenance Door: Front, Cabinet Design: Module, Display Net Weight: 213.85 lbs. per face (+/- 10%). Electrical & Venting Requirements: AC Power Required: 120V, Total Boot Up Amps*: 13.3, Regular Operating Amps*: 3.85, Venting Requirement*: 253.81 CFM, provide pair of 2" conduits back to 2005 for power and comm. Installation / Fabrication: install concrete pad that will need to be poured for the new sign. The sign will also attached to a 4" metal pole that will be cemented in the ground. Do they envision the base to be brick to match the building, a metal pole cover or just concrete? Do they have color preferences for their two colors? It would appear from two runs of conduit that they may want fiberoptic communications. If so, how long is the run from the programming computer and where is it in the building? For example, does an electrician have to pull cable through ceilings, walls, etc.? Other forms of communications are available, wireless data (receiver at the sign) connecting to programming computer and available to schedule from a mobile phone, or radio frequency? The 4" pole specified may or may not be sufficient for the wind load. Answer: The digital display specification is what is critical. The cabinet design may vary. No lettering and a minimal cabinet. Part of this is for the sign company to provide a design or the General to coordinate work scopes. If something is inadequate for wind load, what is recommended? The may use existing footing or create a new. If a site visit is needed the MATOC Contractor may coordinate it with Maj Noah Diehl. Question: What is the planned size of the pre-cast box culvert for Item 002? Answer: --Based on the site visit the existing curb inlet is to be eliminated and new area inlet is to be installed. Use an area inlet assembly 2'-3" x3'-3" would be my recommendation. Question: Does this pre-cast box need to have any rip-rap placed at the ends and what class does it need to be? Answer: n/a Question: Does the pre-cast box need any geotextile fabric placed and what kind of fabric is needed? Answer: n/a Question: Are there any pre-cast drawings available with elevations to provide to suppliers? Answer: There are no drawings or elevations. We could shoot the bottom of existing? Question: What are your planned excavations for the digital sign? Answer: --Sign is to be place on a concrete slab. My recommendation is to also place 6" AB-3 under slab. Best guess 3'x8'x1'=24CF roughly 1CY Question: What are the planned size of the demolition of the existing sign and pedestal's? Answer: sign one is 2'x6' remove concrete and base material to a depth of at least 6". Cover with topsoil. Pedestal two if not used for the new sign remove completely. 3'x9' and depth is at least 3'. Question: Where is the planned disposal site for demolished material on Forbes Field from the work area? Answer: Haul concrete offsite. Road soil excavation will be placed at the north end. Question: What is the expected depth of the existing concrete for the ramp repairs? Answer: see attached UFC. Depth may vary 6" to 8". Question: What type of subgrade prep is needed for the full depth patches in the ramp area? Answer: There are no full depth patches on ramp area. Question: What is needed for the special training needed to be on the ramp for the full depth patching, I cannot find what is needed? Answer: the training is security related. It goes into depth on how to operate on a Aircraft ramp it will be completed on the notice to proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA14-2/W912JC-17-R-0005/listing.html)
 
Place of Performance
Address: 5920 SE Coyote Drive, Topeka, Kansas, 66619, United States
Zip Code: 66619
 
Record
SN04545991-W 20170617/170615235238-0a9ca6271244a56215d687ad17556b40 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.