Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 08, 2017 FBO #5676
AWARD

Z -- Gulf Intracoastal Waterway, Texas Main Channel Across San Antonio Bay in Calhoun and Aransas Counties, Texas, Pipeline Dredging

Notice Date
6/6/2017
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Fort Worth, Attn: CESWF-CT, PO Box 17300, Fort Worth, Texas, 76102-0300, United States
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-17-B-0011
 
Archive Date
6/17/2017
 
Point of Contact
Curtis Cole, Jr., Phone: 4097663185, Maria E. Rodriguez, Phone: 4097666331
 
E-Mail Address
curtis.cole@usace.army.mil, maria.e.rodriguez@usace.army.mil
(curtis.cole@usace.army.mil, maria.e.rodriguez@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9126G-17-C-0043
 
Award Date
6/2/2017
 
Awardee
RLB CONTRACTING, INC., 410 Broadway St., PO Box 1739, Port Lavac, Texas 77979, United States
 
Award Amount
$5,367,500.00 Including all Options
 
Description
Pipeline Dredging Project Description of Award - The Base Schedule 1 includes maintenance pipeline dredging of approximately 1,091,000 Cubic Yards (CY) of material from the GIWW vicinity of San Antonio Bay. Duration is 125 Calendar Days for Base. Option No. 1 is for maintenance pipeline dredging of approximately 139,000 CY of material vicinity of East San Antonio Bay for additional 20 Calendars. Option No. 2 is for maintenance pipeline dredging of approximately 130,000 CY of material vicinity of West San Antonio Bay for additional 17 Calendar Days. - Option No. 3 is for maintenance pipeline dredging of approximately 247,000 CY of material vicinity of intersection of the Gulf Intracoastal Waterway and the Matagorda Ship Channel for additional 35 Calendar Days. Option No. 4 is for an additional foot of maintenance pipeline dredging in San Antonio Bay reach (Schedule 1) with approximate quantity of 342,000 CY with additional 30 Calendar Days. Option No. 5 is for construction of sidecast retaining berms at Beneficial Use Placement Areas A and B, for 1 JOB for an additional 20 Calendar Days and Option No. 6 for Hazard Warning Signs at BUS A 1 JOB for an additional 20 Calendar Days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-17-B-0011/listing.html)
 
Record
SN04533276-W 20170608/170606234720-0b5182b87d57ea5568cfa166aa0d1b25 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.