SOURCES SOUGHT
56 -- Restore the Historic Point Reyes Lighthouse and Enhance Visitor Services
- Notice Date
- 4/18/2017
- Notice Type
- Sources Sought
- NAICS
- 236118
— Residential Remodelers
- Contracting Office
- Department of the Interior, National Park Service, NPS - All Offices, 12795 West Alameda Parkway, Post Office Box 25287, Denver, Colorado, 80225-0287
- ZIP Code
- 80225-0287
- Solicitation Number
- PORENPSLIGHTHOUSECLOCK
- Archive Date
- 5/16/2017
- Point of Contact
- Patti Auten, Phone: (303) 987-6689, Jason Longshore, Phone: (303) 969-2288
- E-Mail Address
-
patti_auten@nps.gov, jason_longshore@nps.gov
(patti_auten@nps.gov, jason_longshore@nps.gov)
- Small Business Set-Aside
- N/A
- Description
- Clockworks The National Park Service has a requirement for the project stated below. If you are interested, please submit your detailed capabilities and requested information in WRITING to demonstrate experience. This is not a request for proposal or invitation to bid. There is no bid package, solicitation, specification or drawings available with this announcement. Response is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought/market research announcement or any follow-up information requests. If you chose to submit a package, clearly identify the park and a project on your package (PORE - 149469), your socioeconomic status (8(a), HUBZone, Service Disabled Veteran, WOSB, EDWOSB, Small). Your email capability/qualification information MUST be 6 pages or less and be SPECIFIC to the scope provided. Submit a capabilities/qualification statement for you or your company and for any Sub-Contractor you would use on the project. Your response is due no later than 5pm MST May 1, 2017. Please email your responses to: jason_longshore@nps.gov Analysis of the responses to this sources sought announcement will be considered in the market research being conducted and in the determination of qualification for this project. Point Reyes National Park PORE 149469 Lighthouse at the Point Reyes Light Station Estimated Period of Performance: 09/17 - 3/18 Scope: The primary goal of the project is to rehabilitate the Lighthouse at the Point Reyes Light Station. Rehabilitation design will be prepared in compliance with the Secretary of the Interior's Standards for Rehabilitation. The clockworks will be removed, stored and re-stored prior to beginning of the main project. An extent conditions report will be provided. The vendor shall have the option to remove and restore the clockworks offsite or to complete the work within another building onsite. The clockwork assembly is a French-style rotation clock inside a pedestal with a weighted drive, maintenance gearing, hand winding crank and cable wound drum, speed regulator, and lens driving gears. Some of the worn parts were replaced with replicas, such as the crank handle, and the assembly was restored by Pierre Donse in 1985, a Horologist trained in Switzerland. It is currently coated with a protective film to mitigate need to polish brass gears and components. This sometimes causes tarnish underneath the protective film and this should be taken into consideration for this project The lens apparatus has not been disassembled or removed from the Lighthouse since their original installation in 1870. The Fresnel lens is controlled museum property due to their age, rarity, high monetary value, historical value and integrity, and vulnerability to damage by agents of deterioration. Capability Information: 1. Past Performance: In the first stage of the project, before structural renovation can begin, the lighthouse lens will be disassembled and removed from the lighthouse structure for repair and conservation and then returned and reassembled after construction is complete. Interested vendors shall submit up to five (5) examples of past performance on similar lens projects in scope that occurred within the last ten years. Projects cited should demonstrate that the Contractor has the technical capability, skills and experience to successfully remove the lighthouse structure for repair and conservation and then returned and reassembled after construction is complete. 2. Resume: Interested vendors shall submit resumes of proposed indivduals that demonstrate experience and qualifications with the removal and installation of lighthouse lens. 3. Project approach Provide a brief description of how the vendor would approach and execute this project.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/PORENPSLIGHTHOUSECLOCK/listing.html)
- Record
- SN04476303-W 20170420/170418235033-ebb4c975a81b1eeeb9ee75da54d3c738 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |