Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 25, 2017 FBO #5573
SOLICITATION NOTICE

60 -- Fiber Optic Installation - Fiber Optic Installation

Notice Date
2/23/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFLCMC - Hanscom, 9 Eglin Street, Hanscom AFB, Massachusetts, 01731, United States
 
ZIP Code
01731
 
Solicitation Number
F2BGAB7023A001
 
Archive Date
3/28/2017
 
Point of Contact
Jordan A. Dalessio, Phone: 7812250186, John Meehan, Phone: 7812250317
 
E-Mail Address
jordan.dalessio@us.af.mil, john.meehan.4@us.af.mil
(jordan.dalessio@us.af.mil, john.meehan.4@us.af.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Installation of three new fiber optic point-to-point connections existing through underground conduit pathway. Supply and install a 144 count single mode fiber cable from building 100 to building 120 (approx. 1000 ft). Leave old 12 strand multi-mode fiber in place for IDS system use. Cut-over communications connections to new fiber. Supply and install a 144 count single mode fiber cable from building 100 to building 142 (approx. 2000 ft). Remove old 72 strand single mode fiber once new fiber is in place and terminated. Hot swap connections from old fiber to new fiber. Supply and install a 144 count single mode fiber cable from building 142 to building 120 (approx. 1800 ft). Remove old 12 strand single mode fiber. Splice at least 48 of the 144 fibers at each termination point. Label each termination location and label the cable at each panel with the distant end location. Install fiber patch panels at each termination point including an extra panel in building 100 to re-terminate all buildings fiber connections terminating in building 100. Transfer all existing connections to new fiber patch panel. Coordinate downtime with local communications POCs before transferring or hot swapping any fiber. All connectors will meet existing Air Force requirements. Provide fiber certification and test results, fiber routing paths, and fiber assignment details at the end of the project. Fiber should provide 10 GB data rate. Requesting 10-year warranty on fiber cable and connections and 90 day maintenance contract for any immediate issues after project completion.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/ESC/F2BGAB7023A001/listing.html)
 
Place of Performance
Address: New Boston AF Station, New Boston AF Station, New Hampshire, 03070, United States
Zip Code: 03070
 
Record
SN04412283-W 20170225/170223234736-36aaf4f7e6f99c34cb0d8b05d9a74ca1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.