DOCUMENT
Y -- F-35 Aircraft Maintenance Hangar and Flightline Apron Expansion at Marine Corps Air Station (MCAS) Miramar, in San Diego, California - Attachment
- Notice Date
- 12/16/2016
- Notice Type
- Attachment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- N62473 NAVFAC SOUTHWEST, CENTRAL IPT CODE ROPCA 1220 Pacific Highway San Diego, CA
- Solicitation Number
- N6247317S3404
- Response Due
- 1/5/2017
- Archive Date
- 1/20/2017
- Point of Contact
- ROY LAYUG 6195324371
- E-Mail Address
-
NAVFAC SW Contract Specialist
(roy.layug@navy.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment 02 Dated December 16, 2016 Sources Sought Number: N6247317S3404 The purpose of Amendment 02 is: 1.To answer RFI questions 1 and 2. 2.To REMOVE and REPLACE the EXPERIENCE factor as follows: REMOVE: 4) Experience: Submit a minimum of three and maximum of five Government or commercial new construction contracts/projects your firm has substantially completed in the last five (5) years, as a prime contractor, that best demonstrate your experience on projects that are similar in size, scope, and complexity to this requirement. Experience must be demonstrated in construction of new aircraft maintenance hangars or similar facility, SAPF spaces, and Portland cement concrete airfield pavement for heavy winged aircraft. All hangar projects must have a minimum construction cost of $50,000,000 and all airfield pavement projects must have a minimum size of 500,000 square feet. All projects must involve new construction of facilities; repair projects will not be considered. For each of the contracts/projects submitted for experience, provide the title, location, whether prime or subcontractor work, award and completion dates, contract or subcontract final cost, type of work, type of contract, a narrative description of the product/services provided by your firm, and customer information including point of contact, phone number and email address. Recent is defined as having been completed within the five years prior to the Sources Sought Synopsis issuance date. Substantially complete projects are those that are at least 80 percent completed as of the Sources Sought issuance date. Be advised that although substantially complete projects will be considered for market research purposes, if an actual solicitation is announced, all projects submitted in response to the solicitation must be 100 percent complete. REPLACE WITH: 4) Experience: Submit a minimum of three and maximum of five Government or commercial new construction contracts/projects your firm has substantially completed in the last seven (7) years, as a prime contractor, that best demonstrate your experience on projects that are similar in size, scope, and complexity to this requirement. Experience must be demonstrated in the following areas:. Construction of new aircraft maintenance hangars or similar facility with a minimum construction cost of $30,000,000.. Construction of a facility containing at least one SAPF space.. Portland cement concrete airfield pavement for heavy winged aircraft with a minimum size of 100,000 square feet.. Vertical construction project at a minimum construction cost of $50,000,000. Each project submitted must demonstrate at least one of the above criteria. Experience in each area must be met in the overall projects submitted but is not required to be shown concurrently within any single project. All projects must involve new construction of facilities; repair projects will not be considered. For each of the contracts/projects submitted for experience, provide the title, location, whether prime or subcontractor work, award and completion dates, contract or subcontract final cost, type of work, type of contract, a narrative description of the product/services provided by your firm, and customer information including point of contact, phone number and email address. Recent is defined as having been completed within the seven years prior to the Sources Sought Synopsis issuance date. Substantially complete projects are those that are at least 80 percent completed as of the Sources Sought issuance date. Be advised that although substantially complete projects will be considered for market research purposes, if an actual solicitation is announced, all projects submitted in response to the solicitation must be 100 percent complete. PLEASE SEE ATTACHED DOCUMENT TITLED N6247317S3404 SOURCES SOUGHT JSF MIRAMAR AMENDMENT 2 . The due date for Responses to this Sources Sought on 5 January 2017 remains unchanged
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711A2/N6247317S3404/listing.html)
- Document(s)
- Attachment
- File Name: N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf (https://www.neco.navy.mil/synopsis_file/N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf)
- Link: https://www.neco.navy.mil/synopsis_file/N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf (https://www.neco.navy.mil/synopsis_file/N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf)
- Place of Performance
- Address: MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
- Zip Code: 92145
- Zip Code: 92145
- Record
- SN04353704-W 20161218/161216233906-28255984849940a7700362feafed3b74 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |