Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 20, 2016 FBO #5476
AWARD

Y -- Design-Bid-Build (DBB) Structural Repairs at Berths 11A, 11B, and 11C, Portsmouth Naval Shipyard, Kittery, ME

Notice Date
11/18/2016
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
N40085 NAVFAC Mid-Atlantic Naval Facilities Engineering Command, Mid-Atlantic Code AQ, 9742 Maryland Avenue Norfolk, VA
 
ZIP Code
00000
 
Solicitation Number
N4008516R3011
 
Response Due
6/16/2016
 
Archive Date
12/31/2016
 
Point of Contact
Crystal Godwin (757) 341-1986
 
Small Business Set-Aside
N/A
 
Award Number
N40085-17-C-5003
 
Award Date
11/30/2016
 
Awardee
Cianbro Corporation (DUNS 006854210)<br />
 
Award Amount
$28,860,243.00
 
Description
This project provides repair modernization of 1263 LF of pile supported open wharf structures originally constructed in 1943 with the intent of restoring the load carrying capacity of the portal crane rail system along the waterfront and providing corrosion protection of the wharf to allow for continued optimal usage of the facility. Berths 11A, 11B, and 11C are actively used for submarine maintenance availabilities at Portsmouth Naval Shipyard. Sections of the berths will remain in-use for the full duration of the project. The work area is within a highly congested industrial environment and the repair effort requires detailed work sequencing requirements to avoid disruption or delays to the ongoing boat maintenance schedules. The work includes removal and disposal of existing timber fender system, curbs, FRP catwalk and miscellaneous items; dredging; providing steel sheet pile and rock socketed king piles with concrete shutter panel bulkheads; rock anchored tie back system; providing backfill under the existing wharf; extending storm drainage discharge pipes through the bulkhead; concrete and pile jacket repairs to the existing wharf structure; providing driven steel H Piles (support piles) through existing wharf deck to strengthen existing crane rail beams; removing and reconstructing areas of existing concrete wharf deck for fill placement and support pile installation; providing a timber deck extension, deck fittings, lighting, mechanical and electrical utilities, duct bank repairs, and incidental and related work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62470HR/N4008516R3011/listing.html)
 
Record
SN04331730-W 20161120/161118234043-1c40891a3a49036475ad84ed7ed8e3e0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.