SOLICITATION NOTICE

Z -- REPAIR BY REPLACEMENT OF EXISTING ELEVATOR AND DUMBWAITER SYSTEMS - ADDITIONAL INFORMATION

Notice Date
11/2/2016
 
Notice Type
Presolicitation
 
NAICS
238290 — Other Building Equipment Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Far East, Unit 15546, Attn:CEPOF-CT, Seoul, 96205-0610, Korea, South
 
ZIP Code
00000
 
Solicitation Number
W5J9JE-17-R-0002
 
Archive Date
12/5/2016
 
Point of Contact
Kimberly Robinson, Phone: 5407234884, RUTH RIDENHOUR, Phone: 5407221039
 
E-Mail Address
Kimberly.M.Robinson@usace.army.mil, RUTH.RIDENHOUR@USACE.ARMY.MIL
(Kimberly.M.Robinson@usace.army.mil, RUTH.RIDENHOUR@USACE.ARMY.MIL)
 
Small Business Set-Aside
N/A
 
Description
PRE-SOLICITATION NOTICE - ADDITIONALLY INFORMATION Remove thirteen (13) existing elevators and three (3) existing dumbwaiters. All elevators and dumbwaiters systems shall be removed in their entirety, to include all associative system in hoist ways and machine rooms. Provide and install thirteen (13) new elevators and three (3) new dumbwaiters. New conveying system shall be full and complete, and all associative components and must be completed before starting work on the succeeding phase. First phase must be completed before construction/proceeding onto the second phase. Contractor shall provide and install all aspects of new conveying system to include but not limited to: - Elevator cab, motor, control panels, guiderails, trim finishes - Pit ladder - Door support angles - Lighting, switches, outlets and conduit - Phone circuits, branch circuits - Venting, heating and cooling as required per code Contractor/elevator and dumbwaiter manufacturer shall design new elevator/dumbwaiter systems, and adapt those systems to existing site conditions as required for fully functioning, code compliant installations. New elevators and dumbwaiters shall be quantities, locations, dimensions, and capacities as required in the specifications. All new elevators shall be of one manufacturer, all new dumbwaiters shall be of one manufacturer. Multiple manufacturers will not be accepted. New elevators controllers shall include all Life Safety capabilities as required and meet all aspects of either U.S. or European elevator codes. The project shall include but not be limited to all verifications of existing conditions, material, labor, and equipment as necessary to complete installation of new elevators and dumbwaiters. Contractor shall have experience providing and installing Geared Electric Traction elevators of general criteria as follows: 2 to 10 floors Overhead Machine Rooms Hospital elevators with all features for accessibility and non-ambulatory occupants. •- Project shall/will meet all aspects of either U.S. or European elevator codes.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA81/W5J9JE-17-R-0002/listing.html)
 
Place of Performance
Address: KABUL NATIONAL MILITARY HOSPITAL, KABUL, Afghanistan
 
Record
SN04319162-W 20161104/161102234954-c5e4d45a871a8eaaa02bb1e933890845 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.