Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 19, 2016 FBO #5414
AWARD

Z -- ASP/LANGFORD LAKE ROAD REPAIR AND DRAINAGE IMPROVEMENT, FT IRIWN, CA

Notice Date
9/17/2016
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Los Angeles, 915 Wilshire Blvd, Suite 930, Los Angeles, California, 90017-3401, United States
 
ZIP Code
90017-3401
 
Solicitation Number
W912PL-16-R-0063
 
Archive Date
10/2/2016
 
Point of Contact
Lucia A. Carvajal, Phone: 2134523240
 
E-Mail Address
lucia.a.carvajal@usace.army.mil
(lucia.a.carvajal@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PL-16-C-0035
 
Award Date
9/17/2016
 
Awardee
RAL INVESTMENT CORP DBA SILVERSTRAND CONSTRUCTION, 11 696 SORRENTO VALLEY ROARD, SUITE 202, SAN DIEGO, California 92121-1024, United States
 
Award Amount
$6,152,963.10
 
Line Number
0001-0017
 
Description
Ammunition Supply Point, hereinafter (ASP) AND /Langford Lake Road Repair and Drainage Improvement, Fort Irwin, San Bernardino County, CA. The Fort Irwin NTC Cantonment area received an intense rainfall event last October which created flash floods, causing damage to Fort Irwin property. The flash flood damaged storm drainage channels, deposited sediment on roadways and parking areas, flooded buildings, and affected the structural integrity of major roadways. In addition, the roadways were previously under-designed and have exceeded their life span. As part of the project ASP Loop Road and intersecting Langford Lake Road will be demolished, excavated, regraded, compacted, and repaved to properly handle the heavy vehicle loading expected. In addition, the two channels adjacent to ASP Loop Road will be improved and protected to protect the road from future storm events and provide proper storm drainage. To improve protection of adjacent facilities and Langford Lake Road, a berm has been designed to divert surface run-off and flow from adjacent tributaries. Work also includes utility re-route, guard rail repair and other minor drainage work. The total contract performance period is 365 Calendar Days from contactor's receipt of Notice to Proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA09/Awards/W912PL-16-C-0035.html)
 
Record
SN04276774-W 20160919/160917233147-44370206ecb95e46879b312b51ef159b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.