99 -- Rip Rap for John Martin Dam - Amendment 1

Notice Date
8/23/2016
 
Notice Type
Modification/Amendment
 
NAICS
212319 — Other Crushed and Broken Stone Mining and Quarrying
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-16-T-0099
 
Archive Date
9/13/2016
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 0001 Statement of Requirements (SOR) John Martin Dam Rip Rap 1.0 General: The US Army Corps of Engineers, Albuquerque District, is in need of 2,400 tons of granite riprap, per the requirements listed below. The delivery location below is in Hasty, Colorado for the John Martin Lake Project. 1.1 Description of Requirements: The 2,400 tons of Riprap must meet the following minimum requirements. • Quantity: o 800 tons Granite rip rap ranging in size from 9" to 22" o 800 tons Granite rip rap ranging in size from 18" to 24" o 800 tons Granite rip rap ranging in size from 24" to 36" • Quality: o Freeze-Thaw Durability: Rip rap shall have a percent loss of no more than 0.1% as measured by ASTM D5312-12 o Soundness: Rip rap shall have a percent loss of no more than 0.5% as measured by ASTM D5240 o Rip rap rock type, durability, and soundness shall be shown in test reports from the source quarry dated no more than 1 year prior to contract award date; test reports must be approved by the Operations POC prior to purchase and delivery of rip rap. 1.2 Delivery Location: 2,400 tons of granite rip rap shall be delivered to the location listed below, and as directed by the John Martin Maintenance Supervisor. Rip Rap shall be stockpiled such that it can be moved safely by site personnel with available equipment; coordinate with the Maintenance Supervisor on this requirement. Latitude: 38° 3'17.11"N, Longitude: 102°56'5.95"W (See image of location below). 1.3 Delivery Time: Riprap shall be delivered within 45 calendar days of date of contract award. 1.4 Submittals: Riprap quality testing reports as described in Section 1.1 shall be submitted for each material gradation with the offeror's bid. After award and upon delivery the Contractor shall submit reports showing quality test results as well as tickets showing tonnage of each gradation delivered. 1.5 Points of Contact: This Riprap is for the USACE - John Martin Lake Project 29955 County Rd. 25.75 Hasty, CO 81044 (719) 336-3476 Lake Manager: Karen Downey Karen.S.Downey@usace.army.mil (719) 336-3476 Maintenance Supervisor: Kerry Roesch Kerry.P.Roesch@usace.army.mil (719) 336-3476 Operations POC: Tracy Aragon Tracy.R.Aragon@usace.army.mil (505) 342-3319 1.6 Invoices: Invoices shall be provided to the following: • CEFC-L4invoices@usace.army.mil • Gari.S.Wells@usace.army.mil • Tracy.R.Aragon@usace.army.mil • Bernadette.L.Armijo@usace.army.mil 1.7 Bid Option 1: An additional 800 tons of Granite rip rap ranging in size from 18" to 24" 1.8 Bid Option 2: An additional 800 tons of Granite rip rap ranging in size from 24" to 36"
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/W912PP-16-T-0099/listing.html)
 
Place of Performance
Address: 29955 County Rd. 25.75, Hasty, Colorado, 81044, United States
Zip Code: 81044
 
Record
SN04236105-W 20160825/160823234617-09780d8d056babe11ed466381789e15a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.