Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 24, 2016 FBO #5388
MODIFICATION

66 -- SPUTTER COATER

Notice Date
8/22/2016
 
Notice Type
Modification/Amendment
 
NAICS
334516 — Analytical Laboratory Instrument Manufacturing
 
Contracting Office
Department of Commerce, National Institute of Standards and Technology (NIST), Acquisition Management Division, 100 Bureau Drive, Building 301, Room B130, Gaithersburg, Maryland, 20899-1410, United States
 
ZIP Code
20899-1410
 
Solicitation Number
SB1341-16-RQ-0780
 
Archive Date
9/13/2016
 
Point of Contact
Ranae M. Armstrong, Phone: 3019758088, Lynda M Roark, Phone: 3019753725
 
E-Mail Address
ranae.armstrong@nist.gov, Lynda.Roark@nist.gov
(ranae.armstrong@nist.gov, Lynda.Roark@nist.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
The purpose of amendment 0002 is to extend the NLT response date FROM: August 19, 2016 TO: August 29, 2016, 12:00pm EST; AND to provide the following questions and responses: Q1. Specify the substrate shape and size requirement that will be used for acceptance or system usage R1. This is not being used to coat wafers. Chamber size is specified in specification number 1 "Shall have a minimum work chamber size of 125 mm diameter by 100 mm height" Q2. What is the required sputter target size/gun size? R2. Disk style: minimum of 55 mm diameter and 0.1 mm thickness Q3. Is there a requirement for the type of sputter gun required, DC or RF? R3. No Q4. Are gases other than Argon gas required to be processed? R4. Capability for Argon process gas and Nitrogen venting gas is required Q5. Is a heater for the substrate required? R5. No Q6. Is there a vacuum requirement such as minimum base pressure etc..? R6. A clean (oil free) vacuum pumping system capable of pumping down to at least 10^-4 Torr, is required, as indicated in Amendment 0001 Q7. Does "rotational tilting" mean primary/polar rotation and azimuthal rotation (i.e the center of the substrate is fixed during rotation); OR the rotation and tilting will be used independent of each other where the center of the substrate is not fixed. R7. Where the sample is rotated about the vertical and can also be tilted independently from horizontal. Q8. Clarify the number of sputter guns required in the chamber. The solicitation stated a dual sputter technique. If two sputter guns are required, will users share one DC or RF (specify whether DC or RF is required) supply or need two independent power supply. R8. Two sputter guns are required for sequential sputtering. Therefore, both can share the same power source. There is not a requirement for DC or RF Q9. Specify gold target and chromium target diameter and thickness listed in specification number 9. R9. Minimum of 55 mm diameter and 0.1 mm thickness All other terms and conditions remain unchanged
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NIST/AcAsD/SB1341-16-RQ-0780/listing.html)
 
Place of Performance
Address: 100 Bureau Drive, Gaithersburg, Maryland, 20899, United States
Zip Code: 20899
 
Record
SN04235550-W 20160824/160822235949-ab256a230a4a73621b6ed61955929800 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.