MODIFICATION
Y -- ONLY USPFO FOR KANSAS MATOC Contract Holders can submit a proposal on this RFP W912JC-16-R-0002 Project# 200112, CP Range Salina Kansas
- Notice Date
- 7/28/2016
- Notice Type
- Modification/Amendment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, National Guard Bureau, USPFO for Kansas, 2737 South Kansas Avenue, Topeka, Kansas, 66611-1170, United States
- ZIP Code
- 66611-1170
- Solicitation Number
- SMATOCW912JC-16-R-0002
- Point of Contact
- Karen L. Robben, Phone: 7852741273, Linda M. Ehrhart, Phone: 7852741542
- E-Mail Address
-
karen.l.robben.civ@mail.mil, linda.m.ehrhart.civ@mail.mil
(karen.l.robben.civ@mail.mil, linda.m.ehrhart.civ@mail.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment 2 is issued to clarify the due date for proposals and to provide answers to additional questions that have been received: Proposals are due on Tuesday, August 2, 2016 at 2:00 pm CDT. Question 1. Please confirm if the following bid schedule structure is correct. Item # 1 CP/MPQC Range is the base bid. Items # 2 -7 are all option bid items. Answer: Item 1 will be awarded and depending on prices offered - 1 or more or possible all of the remaining bid items will be awarded. Question 2. Will additional days be added to the 120 calendar day performance period if any of the bid items # 2=7 are awarded. Answer: 120 days will be the completion date regardless of the number of items awarded. Additional days will not be added. Question 3. What is the finish for the light gauge girts? S301 Control Tower? Answer : Girts shall be prime painted. Question 4. What is the finish for the ¾' rod bracing? S501 Control Tower? Answer: Rod bracing shall be galvanized. Question 5. Is this project tax exempt? Answer: Yes this project will be tax exempt. Question 6. Sheet ES-101 shows a 2" PVC conduit with a 6 strand SM Fiber optic direct burial grade backbone telephone cable to existing telephone pedestal. Sheet ES-102 shows a 2" PVC conduit with a 4 pair cat 5E UTP Direct burial grade backbone telephone cable to existing pedestal as well. Are these both required? If so are these separate conduits? Answer: The telephone connection shall be 4 pair CAT5E UTP. Question 7. Sheet E-508 CP tower Electrical service rack detail shows Panel PP2 located on the outdoor rack, Sheet E-101 shows Panel PP2 mounted on the 2 nd floor of the tower, what location is required for this panel. Answer: Mount panel PP2 on the electrical rack below the tower. Question 8. Sheet ES-102 ROCA Electrical Site Plan shows mast style lightning protection poles (8) in several locations around the different buildings, are these to be included in the Line Item #1 on the bid form? Or at the corresponding building breakouts? Answer: a corrected drawing was previously posted. Question 9. On Sheet ES-102 general note #2 shows conduits for red light control circuits, are these to be included in the Item #1 breakout as well? Answer: a corrected drawing was previously posted. Question 10. Sheet E-504 has Fence grounding details and references a sheet C-526 for fence details, as well as notes to civil plans. I do not find a sheet C-526 or any indication of fencing on the civil drawings, will there be any fencing and if so, where is the fencing shown on the drawings? Answer: The fencing around the control tower has been eliminated.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA14/SMATOCW912JC-16-R-0002/listing.html)
- Place of Performance
- Address: HQ Range Control, Salina, Kansas, 67456, United States
- Zip Code: 67456
- Zip Code: 67456
- Record
- SN04200635-W 20160730/160728235552-b61789d12bd0fce928fcde6b8298d076 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |