Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 15, 2016 FBO #5348
SOLICITATION NOTICE

Z -- FY14 Emergency Type IV Hydrant Fuel Repair, Phase II, Misawa AB, Japan - Package #1

Notice Date
7/13/2016
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237120 — Oil and Gas Pipeline and Related Structures Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Japan, Attn: CECT-POJ, Unit 45010, APO, 96338-5010, United States
 
ZIP Code
96338-5010
 
Solicitation Number
W912HV-16-R-0007
 
Archive Date
9/9/2016
 
Point of Contact
Tezra J. Hamilton, Phone: 0464078839, Theodore T. Turney, Phone: 3152638836
 
E-Mail Address
tezra.j.hamilton.civ@usace.army.mil, theodore.t.turney.civ@usace.army.mil
(tezra.j.hamilton.civ@usace.army.mil, theodore.t.turney.civ@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
W912HV-16-R-0007 DRAWINGS W912HV-16-R-0007 SPECIFICATIONS W912HV-16-R-0007 RFP Emergency Project will provide mandatory repairs and upgrades needed to the existing out-of-service Type IV Hydrant Fuel System. Project will repair hydrant fueling control system, flow controls, electrical piping, and pressure relief system. This includes replacement of existing programmable logical controller (PLC), installation of return venturi, replacement of oversized back pressure control valve (BPCV), relocation and refurbishing of ESOV, replacement of TRV, and associated piping, installation of new pressure indicating transmitters (PITs) and differential pressure transmitters (DPTs) for PLC support, and replacement of isolation valves with DB&B plug valves. Provide new piping/valves in existing crossover and return pit, perform existing valve pit modifications, and repair and seal tunnel walls and valve pits. Install new piping and valves from filer seperator building to hydrant operating tanks N-1 and N-2 to allow simultaneous issue and receipt for hydrant system per current Type III/IV standard design. This project also includes draining, pigging, capping, and abandoning approximately 10,600 LF of 12 quote mark piping and 10,600 LF of 10 quote mark piping with associated valve pits and removal and demolition of the Aqueous Film Forming Foam (AFFF) system and miscellaneous piping from the filter pump house. Pior to returning hydrant loop to service a comprehensive hydrant tuning and commissioning should be performed by qualified contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA79/W912HV-16-R-0007/listing.html)
 
Place of Performance
Address: Misawa Air Base, Japan, Japan
 
Record
SN04182063-W 20160715/160713235637-6364d8a123057ba4b56e9714c6560494 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.