SOLICITATION NOTICE
Y -- LBNF Far Site Facilities CM/GC
- Notice Date
- 6/28/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Energy, Fermi National Accelerator Laboratory, Fermilab, P.O. BOX 500, MAIL STOP 210 (WH4W), BATAVIA, Illinois, 60510
- ZIP Code
- 60510
- Solicitation Number
- LBNF-6839-STE
- Point of Contact
- Troy Lark, Phone: (630) 840-8698, Greg Wray, Phone: (630) 840-8698
- E-Mail Address
-
tlark@fnal.gov, gwray@fnal.gov
(tlark@fnal.gov, gwray@fnal.gov)
- Small Business Set-Aside
- N/A
- Description
- Under contract to the U.S. Department of Energy, the Fermi National Accelerator Laboratory (Fermilab) is developing and leading the Long-Baseline Neutrino Facility (LBNF) Project, which will provide infrastructure necessary to enable a world-class international program in neutrino physics. Specifically, the LBNF Project plans to build a new high-intensity neutrino beam at Fermilab aimed at large liquid argon-based neutrino detectors planned to be located at the Sanford Underground Research Facility (SURF) in Lead, SD. In support of the Deep Underground Neutrino Experiment (DUNE), the LBNF Project will construct Conventional Facilities (CF) on the surface and a mile deep underground on the 4850-foot level at SURF that provide infrastructure needed to support the neutrino detectors. To construct LBNF facilities at SURF, Fermilab intends to procure a Construction Manager/General Contractor (CM/GC) through a competitive, best value procurement. The LBNF CM/GC work will be structured in distinct phases: - Base Subcontract : includes preconstruction construction management services; - Options 1A and 1B : includes CM/GC Services and execution of the construction of the CF at SURF; - Option 2 : construction management and logistics coordination only of the cryogenic infrastructure systems and detectors to be installed at SURF through separate contacts held by Fermilab and its partners. During Base Subcontract, the CM/GC will provide support services to LBNF and its existing architecture and engineering team including recommendations on selection of materials, building systems and equipment, construction feasibility, logistics management, value engineering, and factors related to construction, plus cost estimates and schedules, including estimates of alternative designs or materials. The CM/GC will also identify sub tier bid lists, develop complete scope packages for self-performed work and sub tier bid packages, provide recommendations for actions designed to minimize adverse effects of labor or material shortages, time requirements for procurement and installation and construction completion. Design (for facility or experiment) is not within the CM/GC scope. During Options 1A and 1B, the CM/GC will manage and execute underground excavation, excavated rock removal, and all infrastructure and utilities to support the experiment such as power, communications and controls, HVAC, plumbing, and surface facilities to house cryogenic equipment and support DUNE personnel. Schedule : LBNF currently expects to begin final design work of CF in the fourth quarter of calendar year 2016. Onsite Pre-Proposal Meeting is scheduled to be held 07/19/2016 - 07/20/2016. Award of the base subcontract is expected to occur in the fourth quarter of calendar year 2016 with preconstruction activities starting immediately. Construction activities at SURF through the CM/GC contract are expected to begin by mid-2017. Access to RFP Documents : Login to the Fermilab eBid Portal to view documents including the RFP, exhibits, specs, etc. https://www.ebidexchange.com/Default.aspx?cid=0de90019-0cc1-41aa-bd6f-328c906f5bbb If you do not have access to the Fermilab eBid Portal, contract Troy Lark at tlark@fnal.gov with your full name, company and email address to gain access. Additional Information : Please view the following link which provides more information on the LBNF/DUNE Project: http://lbnf.fnal.gov CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000,000 and $350,000,000.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/FERMI/FERMI/LBNF-6839-STE/listing.html)
- Place of Performance
- Address: Sanford Underground Research Facility, 630 E. Summit Street., Lead, South Dakota, 57754, United States
- Zip Code: 57754
- Zip Code: 57754
- Record
- SN04164695-W 20160630/160628235015-536f0fe4a7df8ee4749f1e767a6997cb (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |