SOLICITATION NOTICE

Y -- Maintenance dredging of the Hudson River, NY City to Waterford, New York, Federal Navigation Project.

Notice Date
6/7/2016
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, New York, Attn: CENAN-CT, 26 Federal Plaza, New York, New York, 10278-0090, United States
 
ZIP Code
10278-0090
 
Solicitation Number
W912DS-16-B-0011
 
Archive Date
7/8/2016
 
Point of Contact
Mohenda R. Surage, Phone: 9177908088
 
E-Mail Address
mohenda.r.surage@usace.army.mil
(mohenda.r.surage@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) intends to issue an Invitation for Bid (IFB) seeking to award a firm-fixed price construction contract for maintenance dredging of the Hudson River, NY City to Waterford, New York, Federal Navigation Project. The dredged material shall be transported to and placed into a government furnished upland dredge material placement site (DMPS) at Houghtaling Island. The proposed maintenance dredging will require removal of approximately 100,000 cubic yards of critical shoals from the Port of Albany Turning Basin and Staats Point dredge areas. Dredging would be required to a depth of -32 feet COE Mean Lower Low Water (MLLW) project datum plus 1 foot allowable overdepth. The dredged material is expected to consist primarily of silt, clay and fine sands. The Albany Turning Basin dredging requires the use of a mechanical dredge with a closed clamshell environmental bucket. The contractor may also require the use of hopper barges, tug boat(s) and attendant plant to perform dredging, transport and unloading/placement operations. The contract requires preparation of the existing Houghtaling Island upland dredge material placement site prior to the start of dredge material placement operations, including raising the top elevation of approximately 3,500 LF of earthen dike by an average of 4 feet. All necessary permits required for the dredging and dredged material placement will be provided by the government. The contractor will be required to meet all conditions pertaining to the dredging and dredge material placement as specified in these permits. Water Quality Certification restrictions prohibit performing any in-water dredging work earlier than September 1st or later than December 31st. The contractor will be required to commence work within five (5) calendar days after receipt of the Notice to Proceed, and shall prosecute work diligently to substantially complete all work within the time periods provided. The work is estimated to cost between $5,000,000 and $10,000,000. Plans and Specifications for the subject project would be available 23 June 2016, with bid opening on/about 23 July 2016. It is the intention of the Government to award August 2016 and issue the NTP on/about 1 September 2016. Liquidated Damages are to be $1055.00 per calendar day of delay until all work under the contract is accepted. This is a 100% Small Business set-aside procurement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA51/W912DS-16-B-0011/listing.html)
 
Record
SN04141060-W 20160609/160607234945-553376eef0f8ebbdc9a7d1de12ba2030 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.