SOLICITATION NOTICE
Y -- CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US) & YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea
- Notice Date
- 5/13/2016
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Far East, Unit 15546, Attn:CEPOF-CT, Seoul, 96205-0610, Korea, South
- ZIP Code
- 00000
- Solicitation Number
- W912UM16R0009
- Archive Date
- 6/13/2016
- Point of Contact
- Tong-Hui Yi, Phone: 3157217436, Ronald Lim, Phone: 3157217585
- E-Mail Address
-
tong-hui.yi@usace.army.mil, ronald.lim@usace.army.mil
(tong-hui.yi@usace.army.mil, ronald.lim@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- I. Synopsis: a. The U.S. Army Corps of Engineers Far East District (FED) anticipates the issuance of a Request for Proposal and the award of a firm-fixed price construction contract for the CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US) & YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. b. Design-Bid-Build Procurement and negotiated procedures resulting in a firm fixed price contract. c. In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees. d. Award will be based on best value - trade-off source selection procedures. e. Two projects Magnitude of Project: The magnitude for these projects is between $25,000,000 and $100,000,000. The construction contract is subject to specific limitation and availability of funds. II. Requirements: a. CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US) Project: Description of Project: This project is primarily interior construction of a 128,456 Square Foot secure work area within the larger two-story, below grade heavily reinforced KORCOM Operations Center. This facility contains administrative offices, operation centers, data centers, electrical switchgears, uninterruptable power systems, Chemical, Biological, Radiation filtration systems all with redundant capability. Construction shall comply with Intelligence Community Directive (ICD) 705 Standards for Overseas construction. Building envelope is heavily reinforced concrete and includes freight and passenger elevators, multiple blast doors and compartmentalization. Facility, shall comply with DoD Antiterrorism/Force Protection Requirements and other threat mitigation measures. b. YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea Project: Project Description: This project is primarily for the interior construction of an 82,698 square foot, two-story, secure facility containing administrative offices, a data center, and a utility plant. Construction shall comply with Intelligence Community Directive 705 (ICD 705) series documents and existing DoD standards for overseas construction. Building envelope, which includes blast doors and windows comply with DoD Antiterrorism/Force Protection requirements. Building also includes a two-stop, passenger/freight elevator. Project will also require installation of a crash rated perimeter fence, active barriers, Intrusion Detection Systems (IDS), Access Control Systems (ACS), and CCTV electronic security systems. Note: This is a partially constructed facility with a substantial amount of onsite Government Furnished Equipment for installation by the contractor. c. Security Requirements: The Prime Contractor firm shall be responsible for detailing, implementing, and maintaining a construction security program complying with the requirements contained in the ICD 705 for overseas secure facility construction for the duration of the contract in compliance with the Construction Security Plan. The construction security program shall include all aspects of physical, personnel, technical, and procedural security as required to comply with ICD 705 for the final accreditation of the secure facility. At a minimum, the construction security program shall include, but not be limited to the following: (1) Clearance Requirements for Construction: Prime contractor Firm shall be a US Prime (Required) to manage and construct the facility with a Facility Clearance Level (FCL) and Safeguarding capability granted by the Defense Security Service (DSS) at the SECRET level. Local National labor (Restrictions apply) may be utilized to build and perform general construction. Only U.S. Cleared worker are authorized to complete finishing work. (2) Access Control Requirements: Existing temporary site security systems and monitoring shall be implemented by FED and required for all construction personnel, deliveries and visitors. The construction site access control process will include effective screening and searching procedures for the ingress and egress of the construction area. Signage will be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area. (3) Control of Material: All material procured locally for construction will be subject to inspection by government personnel. After material is procured and inspection is completed the material must be stored in the government controlled secured storage area. d. Performance Period: Duration of construction is 1,110 calendar days from Notice to Proceed or Award date. e. Proposal Submission This Solicitation will be issued in TWO PARTS: PART I will verify the Offerors' security qualifications. No pricing will be requested. Only offerors who participate in this step and are determined to possess at least a current DSS Secret Facility Clearance will be eligible to participate and compete for award of this construction contract in PART II of this Solicitation. Also joint venture agreement is required if applicable. • Factor 1 - Facility Clearance (FCL) - Security Qualification PART II will incorporate the full plans and specifications for the construction of this project. Award will be based on the source selection "trade-off" process that allows for a tradeoff between non-cost factors and price and allows the Government to accept other than the lowest priced proposal or other than the highest technically-rated proposal to achieve a best value contract award.. The non-priced technical factors are as follows: • Factor 2 - Past Experience (Prime Contractor) • Factor 3 - Project Schedule (Prime Contractor) • Factor 4 - Organization Management • Factor 5 - Key Personnel Qualification • Factor 6 - Past Performance The tentative dates are as follows: • Issue Step 1 Solicitation: 24 June 2016 • Closing date for receipt of proposals: 6 July 2016 • Issue Step 2 Solicitation: 1 August 2016 • Closing date for receipt of proposals: 29 September 2016 • Contract Award: 30 December 2016 f. One CD copy of the Solicitation (RFP) including plans and specifications will be mailed to Pre-qualified Offerors by USACE, Far East District. There will be no charge for the solicitation documents.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA81/W912UM16R0009/listing.html)
- Place of Performance
- Address: USACE, Far East District, Unit 15546, APO, AP 96205-5546, USAG Humphreys, Korea, South
- Record
- SN04117217-W 20160515/160513234928-ba444af231522f4e90219e2fef5ac4cb (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |