SOLICITATION NOTICE
Y -- CA FLAP SR89(1), Truckee River Bridge
- Notice Date
- 5/11/2016
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6816B00001
- Point of Contact
- Jeremiah Rogers, Phone: 3039633500, Agnes Rysz, Phone: 3039633500
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- The project is located along Lake Tahoe's west shore near the SR 89 and SR 28 intersection area in Tahoe City, California. The work includes realigning State Route 89 between Granlibakken Road and the junction of State Route 89/State Route 28 (SR 89/SR 28) to replace the structurally deficient Fanny Bridge, and to accommodate traffic demands at the SR 89/SR 28 junction in Tahoe City. The purpose of the project is to reduce traffic congestion and improve the safety and operations of SR 89/SR 28 junction in Tahoe City by addressing: present and future automobile travel demand, pedestrian and bicycle mobility, public transit needs, the structural integrity of the Truckee River Bridge (Fanny Bridge), and emergency access to the West Shore within the Fanny Bridge Influence area. Three roundabouts, a new bridge, a bridge replacement, and realigned shared use paths are proposed with the improvements. Option X of the Truckee River Bridge project includes the Dollar Creek Trail project, CA FLAP 10089(1). The Dollar Creek Trail Option proposes to construct 2.2 miles of new shared-use trail along the north shore of Lake Tahoe near State Route (SR) 28 between Dollar Hill and Tahoe Vista. The option will include a shared-use trail, a bridge over Dollar Creek, a marked pedestrian crossing at SR 28 and Dollar Drive, and a neighborhood connector at County Club Drive. The Dollar Creek Shared-Use Trail runs from the Dollar Hill area northeast to Fulton Crescent Drive. Scope of the Work Schedule A: 1.5 miles of roadway improvements, 0.6 miles of path improvements, three roundabouts, one new bridge, one bridge replacement - Significant items include (quantities are subject to change): Sewer Line Utility Relocation 13,000 Tons of Asphalt Concrete Pavement 10,300 Square Feet of Concrete Retaining Walls 1500 Linear Feet of Girders 360 Linear Feet of Drilled Shafts 1,079 Cubic Yards of Concrete 6,800 Square Feet of Rockery Walls 23,000 Cubic Yards of Earthwork Option X: 2.2 miles of new trail and one new pedestrian bridge - Significant items include: 5.8 Acres of Clearing and Grubbing 4, 050 Cubic Yards of Excavation 7,900 Tons of Aggregate Base 2.700 Tons of Hot Asphalt Concrete Pavement 1 Pre-fabricated Steel Bridge (pedestrian bridge) It is anticipated that this project will be advertised in May or June 2016 with construction beginning August 2016 and ending October, 2017. The contracting range for Schedule A and Option X for this project are between $25 million to $35 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00001/listing.html)
- Place of Performance
- Address: Lake Tahoe, Lake Tahoe, California, 96150, United States
- Zip Code: 96150
- Zip Code: 96150
- Record
- SN04112882-W 20160513/160511234256-aa7c1ec4d10414beab9e068fe44142a5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |