Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 19, 2016 FBO #5230
AWARD

Y -- Install Soil Containment Cap on Multi-Purpose

Notice Date
3/17/2016
 
Notice Type
Award Notice
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
N69450 NAVFAC Southeast, PWD Mid-South 5722 Integrity Drive Building 455 Millington, TN
 
ZIP Code
00000
 
Solicitation Number
N6945016R6222
 
Archive Date
4/17/2016
 
Point of Contact
Michael Terrell
 
E-Mail Address
4-5490
 
Small Business Set-Aside
Partial Small Business
 
Award Number
N6945016C6222
 
Award Date
3/17/2016
 
Awardee
Siler Excavating, LLC (DUNS 095808833)<br />
 
Award Amount
$578,109.77
 
Line Number
0001
 
Description
Perform cut/fill operations of the existing contaminated soil to level the site and match the grading profile provided in the attached Turf Field design drawings. A specific final elevation is not required as the Turf Field design shall be modified (by others) based on final site elevations after capping of the site. The final elevation of the containment cap is anticipated to be considered the compacted subgrade elevation under the turf field and track. Excavate and backfill with clean soil all noted components shown on the Turf Field drawings which extend below the subgrade elevation. Excavation shall extend a minimum of 12  beyond the dimensions of the excavation necessary to construct said items according to the Field Turf design drawings unless noted otherwise. Components including, but not necessarily limited to, the following: Bollards for Perimeter Rail “ Place grade stake in center of each location after backfill. Location is 3.5 ™ outside exterior track curb per Turf Field drawings. Irrigation Piping Trench and components Exfiltration Perimeter Piping “ 4 ™ wide minimum. 3 ™ deep minimum. Exfiltration Basin, Controlled Outflow Structure, and Outflow Piping Radius Monuments “Place grade stake in center of each location at completion of project. Track Curbing/Track Lanes “ Transition from the 3 ™ deep exfiltration trench to 18  deep extending under the track footprint out to a minimum of 2 ™ beyond edge of outside track curbing. Utilize excavated materials as part of the cut/fill operations. Contaminated soil shall be spread on site and no disposal is anticipated. Compact newly leveled site and excavations to 90% maximum density in accordance with ASTM D698 Standard Proctor. Install a visible warning barrier such as orange snow fencing across all disturbed areas prior to placement of soil cap. Barrier shall provide visual delineation between in-situ contaminated material and clean soil cap and shall not impede drainage. Backfill excavated areas with clean soil, and place 12 inch minimum soil cap across entire site. Final grading profile shall match grading profile in the attached Turf Field design drawings. A specific elevation is not required. Fill material shall be placed in maximum 6  lifts and compacted to 95% maximum density. Seeding of final site is not required.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N40083A/Awards/N6945016C6222.html)
 
Record
SN04054306-W 20160319/160317235404-b77dbe95c8dff9aa180ed24802548a5d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.