MODIFICATION
54 -- INSTALLATION OF UNIVERSAL FABRIC STRUCTURE TENSION FABRIC STRUCTURES SERIES TFS-RV AT TOOELE ARMY DEPOT
- Notice Date
- 3/7/2016
- Notice Type
- Modification/Amendment
- NAICS
- 332311
— Prefabricated Metal Building and Component Manufacturing
- Contracting Office
- Department of the Army, Army Contracting Command, ACC - APG (W911SR) Edgewood, E4455 LIETZAN ROAD, Aberdeen Proving Ground, Maryland, 21010-5424, United States
- ZIP Code
- 21010-5424
- Solicitation Number
- PANAPG-16-P-00006361
- Archive Date
- 3/23/2016
- Point of Contact
- Denise Thomas, Phone: 410-436-2309
- E-Mail Address
-
denise.thomas29.civ@mail.mil
(denise.thomas29.civ@mail.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- AMENDMENT 0004 under solicitation #PANAPG-16-P-00006361 is hereby issued to revise the Performance Work Statement (PWS) Section 3.0 Requirements. The closing date and time remain unchanged on Tuesday, 08 March 2016 @ 10:00A.M Eastern Time (ET). Proposals must be dated and received by Denise Thomas @ email address denise.thomas29.civ@mail.mil (preferred method) or via U.S. mail at: US Army Contracting Command, Aberdeen Proving Ground, Edgewood Division, Building E4215 Austin Road, Aberdeen Proving Ground, MD 21010. Acknowledged all amendments and submit proposals to Contract Specialist, prior to the above closing date and time. All terms and conditions, requirements, and specifications of the original solicitation remain the same. NO TELEPHONE REQUESTS WILL BE HONORED. Universal Fabric Structure (UFS) PWS revised In the PWS - Section: 3.0 REQUIREMENTS, the following is changed to read as: Delete: "Installation shall include all vestibules and welding and sealing of all seams. The contractor is not responsible for electric and lighting, or heating and air conditioning. THE CONTRACTOR WILL INSTALL INSTALLATION." Replace with: "Installation shall include all vestibules and welding and sealing of all seams. The contractor is not responsible for electric and lighting, or heating and air conditioning. THE CONTRACTOR WILL INSTALL INSULATION." NO TELEPHONE REQUESTS WILL BE HONORED.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/f6bdec25578c60f104f7ab4967fc0d9d)
- Record
- SN04042297-W 20160309/160307235427-f6bdec25578c60f104f7ab4967fc0d9d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |