Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 09, 2016 FBO #5220
MODIFICATION

54 -- INSTALLATION OF UNIVERSAL FABRIC STRUCTURE TENSION FABRIC STRUCTURES SERIES TFS-RV AT TOOELE ARMY DEPOT

Notice Date
3/7/2016
 
Notice Type
Modification/Amendment
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
Department of the Army, Army Contracting Command, ACC - APG (W911SR) Edgewood, E4455 LIETZAN ROAD, Aberdeen Proving Ground, Maryland, 21010-5424, United States
 
ZIP Code
21010-5424
 
Solicitation Number
PANAPG-16-P-00006361
 
Archive Date
3/23/2016
 
Point of Contact
Denise Thomas, Phone: 410-436-2309
 
E-Mail Address
denise.thomas29.civ@mail.mil
(denise.thomas29.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT 0004 under solicitation #PANAPG-16-P-00006361 is hereby issued to revise the Performance Work Statement (PWS) Section 3.0 Requirements. The closing date and time remain unchanged on Tuesday, 08 March 2016 @ 10:00A.M Eastern Time (ET). Proposals must be dated and received by Denise Thomas @ email address denise.thomas29.civ@mail.mil (preferred method) or via U.S. mail at: US Army Contracting Command, Aberdeen Proving Ground, Edgewood Division, Building E4215 Austin Road, Aberdeen Proving Ground, MD 21010. Acknowledged all amendments and submit proposals to Contract Specialist, prior to the above closing date and time. All terms and conditions, requirements, and specifications of the original solicitation remain the same. NO TELEPHONE REQUESTS WILL BE HONORED. Universal Fabric Structure (UFS) PWS revised In the PWS - Section: 3.0 REQUIREMENTS, the following is changed to read as: Delete: "Installation shall include all vestibules and welding and sealing of all seams. The contractor is not responsible for electric and lighting, or heating and air conditioning. THE CONTRACTOR WILL INSTALL INSTALLATION." Replace with: "Installation shall include all vestibules and welding and sealing of all seams. The contractor is not responsible for electric and lighting, or heating and air conditioning. THE CONTRACTOR WILL INSTALL INSULATION." NO TELEPHONE REQUESTS WILL BE HONORED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f6bdec25578c60f104f7ab4967fc0d9d)
 
Record
SN04042297-W 20160309/160307235427-f6bdec25578c60f104f7ab4967fc0d9d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.