Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 06, 2016 FBO #5188
DOCUMENT

Z -- Upgrade Electrical Distribution, 5kV to 15kV, Building 100 NRM 663-15-102 CON - Attachment

Notice Date
2/4/2016
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office 20;77 Wainwright Drive;Walla Walla WA 99362-3994
 
ZIP Code
99362-3994
 
Solicitation Number
VA26016R0001
 
Response Due
4/29/2016
 
Archive Date
7/28/2016
 
Point of Contact
Charlene Duncan, Contracting Officer
 
Small Business Set-Aside
N/A
 
Description
The Department of Veterans Affairs, Network Contracting Office (NCO) 20, plans to issue a solicitation to construct the upgrade of the electrical distribution system from 5kV to 15kV for Building 100 at the Puget Sound Health Care System (PSHCS), Seattle Division. This is an unrestricted solicitation and is open to all businesses regardless of size and socio-economic status. The North American Industrial Classification System (NAICS) code for this work is Building Equipment 238210 Electrical Contractors and Other Wiring Contractors. The small business size standard is $15,000,000.00. In accordance with VAAR 836.204, the magnitude range is between $20,000,000.00 and $50,000,000.00. The project is located at the Veterans Administration Medical Center (VAMC), 1660 S. Columbian Way, Seattle, Washington 98108. Description of Project. Contractor shall provide all necessary equipment, materials, labor, project management and supervision to construct an upgrade to the electrical distribution system for Building 100. The upgrade will be from a 5kV distribution system to a 15kV distribution system. The work will be performed in an actively operating medical center and will be phased to minimize down time of critical electrical systems. Phasing of this project will require significant scheduling and coordination efforts by the prime contractor. Work includes, but is not limited to, the following: 1.Normal power system upgrade, including replacement of the normal power switchgear; 2.Essential power system upgrade, including replacement of the - a.emergency generator; b.essential switchgear; 3.Campus feed interconnection; 4.Motor control center replacement; and 5.Automatic transfer switch replacement. The estimated duration of the project is almost four (4) years. The VA will consider all proposals received from responsive and responsible businesses by the due date and time stated in the solicitation. Proposals shall be submitted in accordance with instructions provided in the solicitation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/WWVAMC687/WWVAMC687/VA26016R0001/listing.html)
 
Document(s)
Attachment
 
File Name: VA260-16-R-0001 Pre-Solit Notice - VA260-16-R-0001.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2544411&FileName=VA260-16-R-0001-001.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2544411&FileName=VA260-16-R-0001-001.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Puget Sound Health Care System;Seattle Division;1660 S. Columbian Way;Seattle, WA
Zip Code: 98108-1597
 
Record
SN04009625-W 20160206/160204234556-453eb8ff50c3bdcf5b16b36db8267e74 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.