Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 22, 2016 FBO #5173
DOCUMENT

J -- ELECTRICAL VOLTAGE TESTING - 619 - Attachment

Notice Date
1/20/2016
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;Central Alabama Veterans Health Care;2400 Hospital Road;Tuskegee, AL
 
Solicitation Number
VA24716R0230
 
Response Due
1/20/2016
 
Archive Date
2/4/2016
 
Point of Contact
Department of Veterans Affairs
 
E-Mail Address
ospital
 
Small Business Set-Aside
N/A
 
Description
Vendor Questions and Responses: 619-16-1-5243-0006 / 619-16-R-0230 / ELECTRICAL VOLTAGE TESTING 1. Generators. a. What type of test are to be performed on the ten (10) generators at the Tuskegee facility? Minimum of 4 hour load test (dynamic or static) that is at least 30% of the nameplate rating of the generator per Joint Commission EC.02.05.07 EP8 b. Are the generators to be "Load Bank Tested"? Yes 2. High Voltage Switchgear a. Besides the normal testing, "Load test high voltage equipment" is asked for. Can this statement be clarified? The testing should follow the guidance laid out by the National Electrical Testing Association (NETA) as stated in VHA Directive 1028. 3. Will equal certifications to NETA be acceptable such as Professional Engineer and degreed engineer with more than 30 years experience? Section 2 sub paragraph (a) of the SOW states that Contractors shall be certified IAW NETA, if the professional or degreed engineer is NETA certified, then yes, otherwise no. 4. Is VHA Directive 2014-1028 a part of this contract? This directive specifies load bank testing of generators (not listed in the specifications) Section 1 sub para (b)- " Supplies and services: Professional testing and maintenance of electrical systems and equipment. Furnish all labor, equipment and supplies necessary to provide electrical analysis to include specialized testing, inspecting, cleaning, adjusting and appraising of electrical distribution system and apparatus to assure their reliable operation. Testing shall be performed in compliance with manufacturer's recommendations and applicable NEMA, NEC, ANSI, ASTM, ASA, and VA standards." 5. VHA Directive 2014-1028 states that circuit breakers 250 amps and above must be tested. Breakers below 250 amps must be exercised. See response to question 4
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/MoVAMC/VACAHCS/VA24716R0230/listing.html)
 
Document(s)
Attachment
 
File Name: VA247-16-R-0230 VA247-16-R-0230_3.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2514978&FileName=VA247-16-R-0230-001.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2514978&FileName=VA247-16-R-0230-001.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Department of Veterans Affairs;Central Alabama Veterans Health Care;2400 Hospital Road;Tuskegee, AL
Zip Code: 36083
 
Record
SN03996568-W 20160122/160120234818-e78600e4bcd21f86f5062924c3b168ee (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.